Conditional Use (Regular) - Roland A and Anna F Dunlap/North American Towers, LLC/West Orange Wireless, LLC - 185- Foot Above-Ground-Level Unipole Wireless Communications Facility (WCF) in an A-R Agricultural- Residential District - North Central Pasco County - South Side of Bent Fork Road, Approximately 1,500 Feet West of Bellamy Bros Boulevard File Number PDD23-CU29

Page 2 of 4Public HearingsDistrict 1

What the county recorded

Published agenda

Staff recommendation

Denial

No disposition in the minutes

The approved minutes do not say what became of this item. That is a gap in the record, not a decision. It is the normal state for 24% of items. Most of those are regular business and board reports that the minutes do not dispose of in writing. This archive never infers an outcome from the fact that someone called a vote.

The source document

Published agenda

The county’s agenda for Planning Commission, Aug 3, 2023

The published PDF, as served by the county. This item is one entry in it.

Approved minutes

The county’s minutes for Planning Commission, Aug 3, 2023

The published PDF, as served by the county. This item is one entry in it.

What was said

Transcript

Machine transcription of 1h 35m of recording, with speaker names inferred from voice matching. 76% of 598 lines carry a name. It shows what was said, not what was decided, and both the words and the names can be wrong.

Read it in the meeting →
Denise

Okay, so this is item Denny's Hernandez Planning and Development. This is item P9. It's PDD 23CU29. On the names of the Roland A, Anna F. Dunlap, North American Towers LLC, West Orange Wireless LLC, free conditional use for 185-foot above-ground level UNIPOL wireless communication facility in an AR agricultural residential district.

The applicant proposes proposes a 185-foot um above-ground level UNICOL wireless communication facility suitable for the co-location of three additional carriers within a 10,000 square foot fenced compound area, which is part of an overall 20-acre, more or less parcel. It's located on the south side of Bent Fork Road, approximately 1,500 feet west of Bellamy Brothers Boulevard. The zoning is AR agricultural residential, the land use is res one, residential one dwelling unit per gross

acre. The subject location is in north-central Pasco County in the rural transition area. The current zoning is AR, Agricultural Residential, to the north is AC. To the south is AR and AC.

The current future land use is Res One, residential one dwelling in a per gross acre, and to the north is AG.

This is a um

An aerial view of where the site is. Access to the site is from Bed Fork Road. Proposed access to the compound lease area for the wireless communication facility is proposed through a 25-foot wide access and utility easement.

The subject side is in red. The proposed location of the tower or wireless communication facility is the yellow dot. To the north of the property is Bent Fork Road. To the east is the Bellamy Brothers Trail. And I'm also showing the location of the other applicant, which is approximately 1920. feet northeast of the subject location and uh St. Joe Road as well. This

is a site plan that was submitted with the application, which includes the tower elevation.

So this application comes to you with a recommendation of denial. It was and I do want to say just like the other application, the applicant did hold a neighborhood meeting. The application was distributed to Omnicom Consulting Group, Mr. Chris Monzingo, who's on who's on here on WebEx. Um Mr. Monzingo stated that um as you know it has to the the the application has to comply with substantive s substantive um requirements of the land development

code. In this case the application did not the applicant did not provide um Design standards under 1002.7C, showing that the minimum height necessary to provide the applicant's proposed design service to the area should be utilized as verified by an independent radio frequency analysis. Also did not provide information under 1002.9, 0.8, 0.3, which basically states that they have to submit sufficient materials, plans,

graphics, narratives. Expert statement to demonstrate compliance with the applicable requirements of the section. Additionally, under that same section, application for tier three for new towers. Under the review, they have to submit other additional information as may be required to technically verify an applicant's assertions. So Mr. Monzingo, so under expert review 1002.13 also

provides in B5 other Met Um I apologize. Based on the results of the expert review the county may require additional information, that's in C. Um that information was not provided to Mr. Montenzingro. So we are recommending that the application be denied. If the Planning Commission so chooses to approve the application, we recommend the alternate motion. Number one, which is to approve the application

with conditions as set forth under the recommend recommended conditions section, and then if the Planning Commission decides that they want to direct the Planning and Development Department to another course of action.

GreyChair

Okay, Denise, any questions?

Chris Williams

I guess my question is um uh Um and ma I guess they can answer this as well, but did they indicate that, gee, let us continue it until we can provide that information? Um

Denise

No, the actual the applicant stated that the and and the applicant can can come up and and state what I'm probably gonna state, which is that some of that information is proprietary, you're not required to submit the information, um, and uh the um the RF consultant did send a denial report which is included in your agenda packet.

Moody

All right. I have a question.

Denise

Sure.

Moody

The ordinance says that when they file an application, they go through a completeness review, and you I don't know, you have 20 days or something like that. Did they go through a completeness review?

Denise

So, yes, they went through a completeness review and also part of the application, it's actually in the conditional use application. It states that no conditional use application will be accepted without a written county-approved timeline. And phasing andor substandard road analysis or county approved exemption letter. That exemption letter did not, those exemption letters did not come till the end of May. So once that happened, we did a review consolidation for the things that our team knows

to review because we're not RF experts and sent all that information to Mr. Monzingo. We all we always send every every application, we send uh that out with a commentary basically

Moody

stating hold hold on. So the ordinance says that within twenty days of receipt of the application, staff's gonna conduct I think it says shell. Mm-hmm. Conduct a completeness review and if there are items missing it shall notify the applicant of the missing items and then if the applicant resubmits some information and there's still something then you're supposed to send it to them again. Was that done? Yes. Did they get this letter within those times?

Denise

Yes, they got the letter through a cell and they also got emails.

Moody

Did those did that completeness review include the request for whatever license it is that they need and the information to determine the necessity for the height of the tower.

Denise

So we did not know that information was not included because we we as we're not subject matter experts, we don't we're not RF engineers, so we didn't know what to look for other than they provided us an RF package. So when that all that information was review consolidation sent out to the

Moody

I understand you don't need to make just need to understand h whether due process happened or not. Yes.

GirardiVice Chair

Okay, any any other questions? Did the Planning Commission want to hear from the Absolute Expert? Yes. Well for sure. Well from I mean from The county's expert, RFA engineer. Do you want to hear from them before they hear from the applicant? Yeah, I'd say yes. And

Denise

Mr. Monsenko's on Wx.

GreyChair

Okay.

Unidentified speakerVoice A

Yeah.

GreyChair

Yeah.

Unidentified speakerVoice A

Oh yeah, this is uh Chris Monzingo. Uh I'm a RF engineer for Omnicom Consulting Group. I'm uh based in Tallahassee, Florida. I've been doing this type of work for At least twenty five years. I I I quit counting the years for a while. Uh we at Omicom review these same types of applications from for many counties in Florida, Hillsboro County. Saint John's County, Malachwa County, Columbia County. We we do quite a few of these, maybe

not as many as as Ms. Donahue does, but this we do do quite a few of these types of reviews. So once I got the information from Denise As usual I go through and and look and see the information that's there that I need. need to conduct uh the analysis that the county wants me to conduct. Which is basically determined if there's actually a need for a tower where they're saying they need a tower. So they did provide some information, but it's very ambiguous. Um For manufacturers

that gave me three different equipment manufacturers. Uh they gave me multiple model numbers of radios and they all are different, right? So If I'm gonna do an analysis of RF coverage, they provided RF coverage maps. I have no idea how they produced them because they never gave me that information. I mean specifics. Because all this equipment is not the same.

It's not a you know. was trying to inform me of how a WISP operates, wireless internet service provider. I'm very well aware of how this operates. Um, which is what I asked. One of the questions why the coverage maps reference in vehicle coverage. Wireless Internet service provider, typical provider coverage. Internet wireless internet to people's house in rural areas where they may be underserved from say your wire carriers and Pasco County, whether that be via fiber, cable,

or D S Line. But at the end of the day I requested uh information Uh they didn't really want to give it up for whatever reason. I get it from Verizon, I get it from T Mobile, I get it from any other applicants. It's not really proprietary information that I request. Um also did after that I did some further research into their S C C licensing. So someone asked that question earlier about SCC licensing. From what I could find, West Orange

Wireless only has uh the only S C C license that they currently have. Uh it doesn't mean that they couldn't obtain FCC one. The ones that they currently have is for point to point. Um Communications, sixty gigahertz microwave communications at Pasco County. Now a lot of whisp use unlicensed equipment to deploy their technology as well. Which means you don't have to have an SEC license to do that. Um They

never gave me any specifics on any equipment.

GreyChair

So therefore you could not make a determination, is that what you're telling us?

Unidentified speakerVoice A

Uh yeah, so I mean I guess we should start with saying that that West Arms Wireless has no no s sites in Pasco County now. So I guess th whether they need coverage or not is kind of a boot point. If they're gonna have a service in Pasco County, they need they need a tower. Because they don't have any this would be literally be their first uh deployment in Pasco County. So I guess you can make the argument that Whether they put up a twenty foot tower or a hundred and eighty foot tower. It would be better than what they have since

they have done. But specifically to validate what they submitted, uh they didn't give me the information I needed to do that.

GirardiVice Chair

Can I ask him a little bit of a little bit of a little bit of Um Chris. Denise read a section of our code and it says Um the minimum height necessary to provide the applicant's design service to the area should be utilized. Were you able to make that determination based on the information you received?

Unidentified speakerVoice A

Because they they provided multiple equipment manufacturers. And one, two, three, four, five different frequency bands that they could deploy equipment in. So all All of those have different characteristics when it comes to The way they operate.

GirardiVice Chair

So let me ask the question differently. Were you able to determine whether this particular service needs a tower? That high.

Unidentified speakerVoice A

I guess the question is I don't know what particular service they're offering because they didn't give me any

GirardiVice Chair

I'm asking well yeah, well from from the services that they're licensed for Were you able to determine whether they need a tower this high?

Unidentified speakerVoice A

So for the license they're for the service they're licensed for, which is a point to point microwave, which would only Literally go from point A to point B. Uh you need you need point A and point B. So they've only provided point A, so I have no idea where they would intend to hook. the other end of their point to point communications to The the the sixty gigahertz license they have for point to point communications is for backhaul would not provide uh they couldn't provide their WISP

service with that license.

What are we here?

for actual service to the community.

GirardiVice Chair

Okay, thank you.

Moody

Just gonna suggest that we should hear from them so that we understand what the proposal is but we're trying to we haven't really heard what they're yeah right trying to do.

GreyChair

Okay. So do you have them present?

Could you please restate your name and address, please?

Deborah Martahue

Good afternoon. Um Deborah Martahue, Martahue Landislaw. Um Is there a cli uh this is the clicker, sorry. Sounds like I have an up the hill battle

Doris Carroll

today.

Deborah Martahue

Um let me share that today I have the owner of the North American Towers with me, um Tim O'Shaughnessy, he's been up here. I have Chris Chesky, who's the owner and principal of West Orange Wireless, who is our co-applicant. I have Gary Brundage who is with Brundage Association uh associates and he was our site acquisition uh specialist, the owners of the property won. Ronald and Anna Dumlap are also here today. Um since everybody seems to be pretty focused on why we

need this tower, um and so am I pointing at the wrong place?

It's not working. There we go. Is that working now? Okay. Um I'm just gonna I I think Everybody we can stipulate that the issue seems to be whether or not we're a communications provider that falls within the parameters of your code and under federal law entitled to provide service in your county. So I'm just going to go through some of the zoning conditions really quick since we have limited time. Um but I do want to point out how heavily

wooded our site was and how we were told at pre-app that you know landscape waiver would not be approved by the zoning administrator because the board does not is not receptive to those things. So we did not apply. But If you wanna wave that at the end, um if you see fit, we're certainly um would be would accept that condition. Again, here's our we're about fift uh two hundred and fifty feet south of Bent Fork Road. We've met all of the site development standards. We're

not asking for any um uh variances or alternative standards for any portion of your code. So it's all a matter of record and I'm not gonna waste a whole lot of time.

GirardiVice Chair

Can you go back to that person 'cause I have a question.

So your tower, unlike the prior tower we saw, is not showing any Antennas sort of emanating out from the pole. Will there be towers

Deborah Martahue

emanating? No, this is a mitigated. We we went by your code since visual impact is a policy in your code that is emphasized. We elected to put in a mitigated tower where all of the antennas will be wholly concealed. We will be using ventilated the new technology as of February. This year by RayCap, the ventilated um uh canisters to allow proper ventilation of the radio equipment.

Connected City

I have a follow-up question that so we're dealing with uh we actually dealt with another case that was this similar type of a tower that was being um they they could no longer use it because the space inside the tower wouldn't house the newer age antennas. Uh and when we were having to build another tower nearby and there was a whole case about that because the existing flagpole tower wouldn't have

Is that a potential for a future issue with this tower as well as technology changes and

Deborah Martahue

I don't know like the date of that and whether or not there were I'm assuming that flagpole didn't have ventilated canisters, that's why I mentioned the van. And I did provide that information to Chris Manzinga um immediately. Um and it is very new technology. in response to the overheating issues. It's really the radio equipment, not the antennas that overheat and the new 5G technology when the radios are placed right next to the antennas. Um that

can cause the problem. Um you can solve the problem by putting the radios in a different canister in those types of uh flagpoles, not knowing the specific of that flagpole and if they have the additional canister capacity, I can't speak to that. But you know

Connected City

Well, one of the issues was the space. Uh the s the actual size of the antennas wouldn't fit inside the space of space constraints of the existing tower. So I was just wondering from from future proofing if this was going to be an issue in the future where as technology improves the antennas get even larger than what they are now where they wouldn't fit inside this tower.

Deborah Martahue

Certainly. I mean we're open to doing a monopole as well. We were again trying follow the rules of your code and mitigate any visual impact. But if you would like to approve a monopole in lieu of the Unipol, we're fine with that as well. Okay, I was just

Connected City

curious 'cause it came up in a previous case.

Deborah Martahue

I understand.

GirardiVice Chair

Well, I guess So do you know whether Pave Horizon or T Mobile or um RT ⁇ T would actually co-locate on this type of tower.

Deborah Martahue

Um Do you want me to stop my presentation and have the owner come up and talk to that?

GirardiVice Chair

I don't.

Deborah Martahue

Okay. Actually. Or can we ask the afterwards?

GirardiVice Chair

Well I can ask the guy from Verizon if he wants.

Yeah.

Deborah Martahue

I would appreciate having my consultants speak to the

GirardiVice Chair

I'm okay if your consultants want to answer the qu I don't care who answers the question. I guess I need to know whether if we approve this tower, 'cause it it potentially with co locations, I wanna know how realistic it is that A Verizon T Mobile, ATT, which are the three major Providers would actually use it. Does

Moody

it matter

GirardiVice Chair

if it's one of the

Moody

three majors so

Deborah Martahue

long as

Moody

the carrier is licensed?

Deborah Martahue

Mm-hmm.

GirardiVice Chair

I think it does matter because It goes to the very issue why the consultant recommended denial, which is because It's also recommended to Nile because he doesn't think that West Orange Wireless needs a tower this tall. So but if A T and T and or Verizon or or T Mobile w need a tower this tall and can use it, that's a different conversation.

Moody

I'm not trying to be argumentative with you. The problem is I haven't heard anybody yet tell me One, who is West Orange Wireless? And I'm gonna have a whole bunch of questions about that. And what services is it that West Orange Wireless provides? Is this cell phone service? Is this internet service? Is this point-to-point microwaves? I don't know what it is. I think we should probably let her that's the first one.

GirardiVice Chair

Yeah, let's go let her finish. I just want I wanted to find out what they were proposing. So they've they've answered. You'll have an

GreyChair

opportunity just to wait.

GirardiVice Chair

Go she can finish. Go ahead. Go ahead.

Deborah Martahue

Thank you. So again, we we were proposing uh our clients will use this tower. It's got the new technology. We're proposing the ventilated canisters.

My clients are West Orange Wireless and North American Towers. We're utilizing RayCap. Um that's the

Moody

Okay, so And I apologize for interrupting. Is West Orange wireless are they s a cellular phone carrier? Are they an internet carrier? What do they do? Who are

Deborah Martahue

they? Can I get to that? And I don't mean to be disrespectful, but I would like to I'll present that. Thank you.

So we're just we met nobody has issues with TEPAC surrounding Land uses. This is where uh we have the photo sims Uh you can see you can't see the tower. Um barely see it there. And the the locations, everything is in your your um your package. You can barely see it there. And you can't see it there. Regardless of whether or not it's a monopole or

a unipole. Um this shows the distance the nearest which goes to everybody in this area to show you that it's it's a communications defic deficit no matter what communication services you're providing, the nearest tower is 4.2 miles away, 4.29 miles away. Um, everybody we speak to, the community meetings, everybody is complaining not only about mobile service, but the lack of internet service. The lack of internet service.

GreyChair

No speaking from the

Deborah Martahue

audience please?

So um with respect to um

your questions about what

Sorry, now I've had so many um what your code uh actually requires and what the definitions are. Um wireless um facilities are fiscal structures, the equipment, the antennas, it's not the providers. You have to provide a co applicant um to permit wireless um They they have to be the uh personal wireless communications provider. uh any proposed tenants and the owner. We've

done all that. Your communications provider for purposes of tier three and uh tier one and tier three, which is what we are, is a communications service provider authorized by the FCC to provide commercial wireless communications such as broadcasting, mobile, paging, cellular, WiMax. Um, it's not limited just to the ones that you're talking about. T Mobile, Sprint well Sprint. But but and that's why I'm going through it. Okay? I it

it's a much broader definition which is which is married to the federal um the federal definition, which also encompasses all of those definitions and unlicensed wireless providers. Unlicensed and I will say when I read Mr. Mongzinga's report We felt like criminals. We're deploying unlicensed equipment. We're deploying unlicensed

um wireless communications and I realize I'm not the RF engineer and I realize how that might be perceived by the decision makers that oh my god we're out here and we're giving services that we're not licensed to do. That's not the case. Not every um license spectrum is very expensive. And why WISPs, that terminology that's being used, is deployed in the rural areas, is to offer a competitive, more economical

solution to um to the residents and businesses in the area to get communication services is they're not buying up all that very, very expensive licensed spectrum. But I'll get to that when the c consultant comes, but I hope that's a good preview for why we're here.

Moody

So Mark, so just explain to me,

Deborah Martahue

are you

Moody

providing Self service, internet service, paging. What what

Deborah Martahue

I'm gonna ha I I I feel I have my ca the the the owner and I think that he's the best person to answer that and if I could get to that segment of my presentation I think we'll be able to answer all of the questions. Thank you. So design service and the reason that after we we provided everything on the tier three checklist. that was required to be provided and why I on behalf of the client started to object. Um first of all the comments came very late

in the game. They were due on June 15th. On June 16, I got an email saying no further questions. On June 18th it became changed my mind. We have all these other questions. By the when we did have a determination of completeness on June 5th by staff, by operation of state statute, our determination of completeness was April 20th. because they have shot clocks as well. And if no further deficiency comments were issued after

our response on on April twentieth, that's the end. That's when you're deemed complete. And there's all kinds of shot clocks that apply. Okay. And the design service, the reason I objected, is in your own code under the definition. It says the configuration and manner of deployment of the service that the communications provider has designed for an area of part of its network. The type and LOS to be provided is not part of design service and is

not part of the county's review. of the wireless communications. facility. And to that end, in the same section of the definitions of your code, the standards say, item number 22 of David's Definition number 22 of David's following along. It says standards. Guidelines are measured to provided by in this section, which by which acceptability of a wireless facility application is determined. Wireless communication facilities are measured

by standards measuring visual impact or safety, which we addressed, the design of the tower. Wireless Planning generally regulates wireless communication facilities on three levels. Location, In parent it says where the the wireless communication facility site can go. We've complied with that, all the regulations. how the wireless communication facility is placed within its setting. We did that with the sighting and the site plan and design what

the wireless communication facility looks like. That's it. It's the end of the review. And Wait. We personally thought if we're the first if this is the first time That West Horn Orange Wireless is entering into your county This isn't a capacity site. I mean, Verizon apparently it's a coverage and capacity site. This is a coverage site for us. And maybe

this might be the good point to bring, here's the definition, taking cut and paste from your code. To go ahead and bring um Mr. Jesky up here, so I could ask him. who he is, who the company is, all the information that we provided. So if you could state your name to the record.

GreyChair

Name and address, Mr. Jesky, please.

Unidentified speakerVoice B

Thank you. It's Chris Jeske. My address is [address removed]. I appreciate your time today. You can tip that. Mickup

GreyChair

if you need.

Amy Heiler

You just

Deborah Martahue

grab the top part

Amy Heiler

of it.

Deborah Martahue

Well that's okay. If the this is gonna go quicker if I just ask him questions, um, if you don't mind. Are you the owner of West Orange Wireless? Yes. Okay. Are do you are you incorporated in the state of Florida? Yes. Yes. Are you authorized and recognized by the FCC as communications provider?

Unidentified speakerVoice B

Yes.

Deborah Martahue

Do you deploy unlicensed um and licensed equipment des like you're the

Unidentified speakerVoice B

Yes, so we we use a combination of both licensed and unlicensed frequencies to deliver a service. We're primarily a broadband services provider, so What I mean by that is that we just provide internet access. We do it to residential and businesses and enterprises around the country. We operate a hybrid fiber and wireless network between our towers. And we deliver last what we call last mile service or actual internet access to the residences and businesses via what's

called fixed wireless. Small antenna that sits on the exterior of the property, it points to a tower. Uh it operates over unlicensed and or lightly licensed frequencies. Uh and I think that's a good thing.

Deborah Martahue

And you're uh and you're certified to deploy that type of equipment.

Unidentified speakerVoice B

I I I personally, yes, I'm a certified professional installer by uh Wincom.

Deborah Martahue

Can you tell the board members where you currently operate and what your plans are for operating.

Unidentified speakerVoice B

As of right now we have sites and customers in Orange County, Lee County, Osceola County, and now we're expanding to Pasco and Hernando County.

Deborah Martahue

Um if you could since this is a I'm sorry, since this is a coverage site, this is your first site here. What what would be your ideal height to to provide?

Unidentified speakerVoice B

So uh I know there's the issue of height is a tricky one because as an unlicensed uh as as a as a provider who uses unlicensed frequencies, we'd we'd love to be as high as we possibly can. Our tallest site in Orange County is four hundred feet above ground, but there's a whole lot of you know red tape that comes along with a site that high. Um so traditionally speaking Um most uh tower providers like to stay away from the FAA regulations and lighting and all that all that sort of stuff that comes with being above two hundred feet above ground level. So uh 185

makes sense from us because it gives us that it it gives us that that height to provide coverage um while also staying kind of afoul of some of those uh apart from some of those other regulations.

GirardiVice Chair

Can I can I stop you right there because I want to quit? So The higher you it's point to point. You're you're broadcasting to a somebody's got like a receiving at their home, they've got something receiving your signal, right? So technically speaking,

Unidentified speakerVoice B

these the the the radios that I was talking about before that exist on the properties, those are considered po point to multi point. So the point to point radios that um Mr. Menzinga was talking about before that we have licensure for, those are as he said, he's correctly asserted that they're backhaul antennas. So they're backhaul radius. So they go from point A to point B to move traffic there, from places where we have fiber uh to places where we don't have fiber. So what

GirardiVice Chair

I'm asking is what what what's in the home that's receiving your signal?

Unidentified speakerVoice B

So the radio exists on the exterior of the property, we mount it to the exterior of the home, uh we run a cable to a wireless router that sits inside the home, and then we distribute it in the home that way.

Moody

You could liken that to like the little dish from dish network.

GirardiVice Chair

Similarly. Is you're you're saying that the higher up you are you can get to more homes, is that why you need to be higher? I don't know f I don't know how you worked to I mean are you saying if if you were low you you if you were you can't go like

Unidentified speakerVoice B

most of our sorry, I don't mean to interrupt but I

GirardiVice Chair

just Can trees interrupt your signal? I mean what what what what stops your signal from getting to the home?

Unidentified speakerVoice B

Yes, so uh again we we work on a combination of uh unlicensed and lightly licensed frequencies. The lightly licensed frequencies are the C BRS frequencies that uh have been submitted uh to Mr. Menzinger for his review. Uh they go through trees a little bit better, uh, but by and large we prefer clear shots where it's line of sight from one house to the Power.

GirardiVice Chair

So you're trying to be up high to get clear of the tree. That's correct. So But if somebody has a tree in front of their house, then you could they can still would they just put it up on their roof is that or like how do

Unidentified speakerVoice B

you Yeah, so either either they're up on a roof, we've had people that have constructed uh actual like tell like T V antenna towers that you know pretty popular way back when. Um they they mounted those forty foot forty foot towers on the side of their house. It i it really just depends on the actual location.

GirardiVice Chair

So you're broadcasting the internet to homes that may not have internet from may not have fiber or Cable. That's correct. Yeah. Okay. And what is your source of the internet? Like how are you getting the internet to your broadcasting source?

Unidentified speakerVoice B

So I'm I I I could get into a really technical discussion. Um Give me the layperson's version. Pardon me? Give me the layperson's version. The layperson version is that we uh through our network, um we we we we take the the internet and we move it over fiber back to our data center that we have in Orlando. And that's where we pick up.

GirardiVice Chair

Are you gonna have a fiber?

Potentially, yes. You see potential. I'm I'm that's what I'm asking, is is if you're trying to provide internet to a bunch of homes in this area. But

Unidentified speakerVoice B

if the tower exists then you would run a fire. That's correct. Yeah.

GirardiVice Chair

Okay, so you might pick somebody who has

Unidentified speakerVoice B

spectrum.

GirardiVice Chair

You might pick up internet from a frontier or Spectrum, Take their internet and then broadcast. I think

Moody

what

GirardiVice Chair

he's

Moody

saying is that they're gonna use their pipe. Not necessarily their service they're gonna borrow their pack extra capacity in their fiber system.

Unidentified speakerVoice B

Exactly. So we we lease fiber from uh from the major carriers, uh whoever happens to have it in the ground at near a site that we're at, and we just route all that traffic back to our data center in Orlando.

Connected City

And if there's a small distance between and you guys pay for the the connection I would assume. Uh we we pay a lot for this connection.

Christopher Poole

Have you confirmed that fiber is there or or do you have to get on a fifty two to get it or where where's the closest fiber in that?

Unidentified speakerVoice B

I I haven't I haven't done a study to determine that yet.

Christopher Poole

Okay.

Deborah Martahue

And just to clarify based on your code, and I didn't highlight it on this slide, I apologize, wireless communications is the transfer of data information through the air using wireless facilities. Is that what you do? Chris Jeske.

Unidentified speakerVoice C

Yes.

Deborah Martahue

Okay. I'm not aware. But that is um I I just I I hear a lot of concerns. We're new and and I understand that. I understand this is a little bit of an education process which is why I'm not sure.

Moody

doing some research on my own, including into your own company. my suspicion here is that we have an ordinance and a consultant and possibly staff And Not to lay blame upon them, but we have technology that is evolving faster than they are. This is something that our ordinance didn't contemplate, that the staff has never seen, maybe the RF engineer does not understand. I suspect that's what we have. This

is something that's new to me and I'll tell you it's actually fascinating 'cause I can I can't get fiber in my neighborhood.

Deborah Martahue

Than thank you, Commissioner Moody, because

Unidentified speakerVoice A

Sir, the you this is Chris. Uh I'm well aware of this technology. It's not really that new. Um, but he's doing it after a while, perhaps uh, you know, said in my report. He's probably going to deploy unlicensed point and multi-point technology. I simply asked for the specifics of the equipment so that I could find a uh model of coverage and that information was not the last.

Deborah Martahue

Actually that information was

Unidentified speakerVoice D

then all

Unidentified speakerVoice A

right.

Deborah Martahue

I respectfully disagree with Mr. Monsinga that that information was provided on a technical data um and We just received his analysis last week. I have prepared or Mr. Jeske prepared a point-by-point response to his concerns. I will be uh they it's already on a flash drive, it was already included. I'm gonna submit and ask for you to accept that into the record. It includes Mr. Mongzinga's certified professional installer of

CBRS devices. And go ahead.

And I wanted to ask Mr. Jesky to tell the board I don't want to speak for you, but that you use a lot of different types of equipment to deploy your services, correct? Okay, can you go ahead and do that?

Unidentified speakerVoice B

Yeah, so w this is Chris Jeske again for the record. Uh we uh as as Ms. Money said, we we use a lot of different equipment um in a lot of different places. It depends on uh well, realistically speaking, it depends a lot on the site itself. So Um some sites will we have higher equipment at, we use different radios because we have that height. Um some sites we're you know we're we're constrained by um you know dimensions, right? So we have to use smaller equipment

or smaller radios to you know to accommodate.

Moody

So why the hundred and eighty five feet height here? What's how's how do you come up with that height?

Unidentified speakerVoice B

So as previous uh As I as I previously stated, um w we would go we would like to go as high as we possibly could. Um but staying under two hundred feet AGL keeps you uh AGL above ground level, sorry. Uh it it it keeps you out of the additional red tape that's associated with having to uh get FA certification and lights and and and all that sort of stuff that goes along with it. So you'd be happy with

Connected City

Below two hundred feet then.

Unidentified speakerVoice B

Yes. Thank you.

Unidentified speakerVoice A

This is Chris Montlingo again. So I got to show him in this point. I was asking for the specifics on how the coverage acts to generate. You didn't generate those coverage maps, uh Mr. Chris, the other Chris there, with multiple pieces of equipment if there were specific pieces of equipment antennas that had to be utilized to generate those coverage maps.

Unidentified speakerVoice B

So the uh this is Chris Chesky again for the record. Uh the coverage maps that were submitted uh were you were were generated using Google's network planner software and it was generated using the antennas the in that we predominantly that we predominantly use in the lightly licensed and CBRS spaces.

Does that answer your question?

Unidentified speakerVoice A

So that information was never provided. That was the only thing I would left.

Unidentified speakerVoice B

Okay, I I can't speak to that, I'm sorry.

Deborah Martahue

I'm sorry Chris, if you did not receive that map. I I I don't know what to say. It was absolutely I don't think

GirardiVice Chair

we're saying he didn't receive the map. He just he didn't receive the information that he just testified to.

Deborah Martahue

I can't control what you received. I can control that we submitted not once but twice the f with our original application we submitted all of that data. We had a deficiency response um that said we didn't list WOW as our co-applicant in a CELA. although it was on our application, it was on our project narrative. And then I was told after all of that was submitted that we had to put it in an RF package.

So we were s resubmitted it All the same information a second time on April 20th as an RF package. I can't control what got transmitted to you or if it did or didn't, but it absolutely was transmitted. I prepared myself, I made sure that every single item on that checklist was addressed. The only thing we didn't address was Beam tilt because we were using canisters

and when you use canisters you don't tilt your antennas like when you're on a monopole. You have the room to tilt. Maybe that helps answer your questions. Okay,

GirardiVice Chair

so

Deborah Martahue

Commissioner

GirardiVice Chair

Weight Cut this short. I want to get to the heart of the issue because our consultant said he just heard information, regardless of whether he why he didn't get it, he just heard information for the first time that apparently is useful to him.

Deborah Martahue

Okay.

GirardiVice Chair

So My question to you, Chris, is now that you have that information Does that change your opinion? Or can you can you now do what you need to do? And if so, how long would you need to do it?

Unidentified speakerVoice A

Well, I still need more specifics, right? So at least I get the frequency back. Uh but I mean

GreyChair

I think he needs a list of equipment.

Denise

Chris, we've lost you.

Moody

But didn't you say that? He he said he provided a list of equipment and and I'm not gonna get into whether he did or he didn't or whether the guy got it or didn't get it and Lord knows I'd play enough around with a cellar too that, you know, sometimes things happen.

It

Unidentified speakerVoice D

sounds to me.

Moody

Yes.

Unidentified speakerVoice D

Okay, I just had the turn that's it all but spin along there. Um again For an RM engineer to generate coverage maps, you need specifics

Unidentified speakerVoice A

about set equipment and received signal levels and things like that. I can generate anything, but it wouldn't be accurate. Without knowing which of the three pieces of uh three different manufacturers

Unidentified speakerVoice D

that they listed, six different frequency bands, which ones they're going to use. And what's what's the receiving you don't have the house phone meeting? And there's proceedings that have to be given before a coverage matter can

Moody

be generated. Isn't that a moot point? Isn't it a moot point? The guy doesn't have any service here to begin with today. He doesn't have any coverage. Any coverage he puts is now coverage on the map. After that when he's trying to justify new towers. Well yeah.

Deborah Martahue

Thank you. Thank you because that is the point I've been trying to make with this application from day one. that we will take any height. And the higher the better. As he has said, his equipment doesn't play well with trees and he needs, you know, distances. He has towers in other counties that are 400 feet where he's co-located 400 feet. Who I don't wanna repeat, but I actually and in and as a threshold issue, again, your own code doesn't

even authorize and I understand past practices that this is what you do and I can't I'm not gonna be every other lawyer that, you know, why some lawyers or companies submit this, that or the other thing. But you're I'm just going by your code. This is not part of the evaluation. And it it it says that the consultant is not authorized to evaluate the type and level of service that is going to be provided by this per um. Well

Moody

that's why I put that up on the screen before. Can you put that back up? I think that's important.

Deborah Martahue

Sorry.

Unidentified speakerVoice E

Well I I guess if I if I can add something here, I I guess I'm I'm kinda hearing things out of both sides of their mouth as we go through the last hour that I've been sitting here. I mean we're sitting here on their application and we're saying Oh yeah, well just because it's said in the code that doesn't mean we have to provide it. Okay, for our for our benefit. It's not applicable here, but then they're gonna stand up for the prior case and they're gonna say, wait a second, the code says they gotta submit for alternative standard. I mean how are they not speaking out of both sides of their mouth here? I mean, the county asked them to submit something. Did they submit it or not? Chris

as the expert or the reviewer for the county said he didn't get it. So what's the problem? Submit the stuff that the guy asked for. Well I'm missing the point.

Deborah Martahue

It's the same code, but Okay. The code as I read it, Mr. Goldstein, who's the authority on his code, disagrees with me.

Unidentified speakerVoice E

You interpreted it the way you wanted to interpret it. That's really what happened. Both cases. In my opinion. Okay, now we can move on. That's we both said our point.

Deborah Martahue

But I am looking at your code and your code does not authorize this type of evaluation. That's not to say that we did not provide all of the base information that was on the tier three checklist, except for the beam tilt, because we're gonna be in canisters. There is no beam tilt. And I actually put an A on that. because if you're in a canister you don't tilt your antennas like you do if you're um on a monopole. So with exterior mounted

antennas, we certainly um we're open to being a monopole. Again, we were trying to mitigate our visual impact. We're not

Connected City

Chaos in a perfect world, what would you prefer? A monopole or a canister?

Deborah Martahue

A perfect world of monopoles.

Uh probably four hundred feet, but but but but we're okay at two we're at okay at one eighty five to

Connected City

two minutes.

Deborah Martahue

Right procedures

Connected City

to go through that or or would it be preferable to say that it's

Deborah Martahue

yeah, we're fine.

GirardiVice Chair

I I don't think you can be giving them a higher height. Yeah,

Connected City

you'd have to you'd have to go back to the application process

Deborah Martahue

for it. Right. So we're

GirardiVice Chair

but yes You can change the design of the poles. But don't I don't you shouldn't be offering them a higher height than what they got an FA.

I

want

to be clear with you, you can't give them a higher height, that's what I'm trying to say. Okay.

Deborah Martahue

Uh I'm hoping and I'm assuming, uh, Commissioner, that you're just saying that in the sense that We are asking for what we really need um to address the height issue, I guess.

Connected City

If we're considering approval or denial or conditional approval of the application, it would be nice to know what you want. So that's that's what I was just trying to get to the crux of what's what?

Deborah Martahue

Well, uh let me just quote one of the old songs I grew up with. You can't always get what you want. And we were just trying to you know, be respectful of our location, what your code requires, our own, you know, type of approval processes above and beyond what we are doing here politically. Um so anyways, here's a search area that was given to Mr. Manzinga. Our propagation map was given to Mr.

Manzinga. Um the standards, the conditional use standards, I I think we can agree that I hope there's no statement in the staff report that says we're not consistent with the comprehensive plan from a zoning standpoint. Um We're not

The quality of the neighborhood. Um, we're consistent with the character and the surrounding area. Again, we offered a mitigated example of the tower. We're not, it's an unmanned facility, there's no increased traffic or parking congestion. We're providing, we're meeting all the code standards with respect to drainage, access, and grease, etc. etc. We are going to be providing the screening and the buffering, unless you choose today to offer us the same waiver or the opportunity

to go through an alternative standard process, whatever your preference is. Clearly we're very heavily vegetated on Mr. Dunlat's property, but we're good either way. Um the proposed conditions will otherw were not adversely affecting the health safety or welfare. I think today between our two applications you've clearly heard there is a communications desert in this area. People the our complaint uh um uh at our two community meetings

that we had. was that people don't have communication services, including internet. including internet. Um because your internet provider that's out here they don't want to spend the money to just go ahead and connect one or two homes because it's very sparse out there. We're also trying to plan for and the reason this area was targeted was the future Amazon Distribution Center. This area I think by having these two applications on your agenda

today and recognize this area is poised for development because it's going to become an employment center and people are going to move to it and they're going to need all types of communication services. So I would hope Based on these two applications that would be a given uh in terms of um an understanding by everybody in the room. So we meet all the conditional um standards. Um I talked about the recent um conditions um I had

submitted all these recent conditions of approval again. I've had to digest a lot since last uh July 26th and I want to thank all of your clerks in the county who have been unbelievably responsive to my requests for documents to try to understand what has been the past practices in this county, what to expect. They have done yeoman's work and I appreciate it. And what I discovered is

the standard conditions of approval c for communication towers Don't look like our conditions of approval and and the one that you just uh saw. We certainly are receptive. Um and and also I do want to note in twenty-two forty Z B C C resolution. Uh this county has analyzed communication networks of others besides the Sprint T Mobiles etcetera of the world. They

they analyze it.

Yes. So if

Moody

if we're to approve there's a there's an alternate if we are to

Deborah Martahue

approve

Moody

your application with some proposed conditions.

Deborah Martahue

See I

Moody

got a problem with some of these.

Deborah Martahue

Uh one, two, three, and four are unlawful, unenforceable, and discriminatory on their face. I have no idea how we would ever provide Uh we can't provide you customer data. We can't I I don't even know how we're going to prove how many Is

Moody

there anywhere in our code where it says they have to support, they have to supply, they have to provide service to a minimum of thirty percent in the residences. Is Verizon obligated to provide service to thirty percent of the residences in the service area for the tower we just approved?

Denise

Mr. Mooney, there is nothing in our code. Let me just the the conditions come from it's a deficient application.

Moody

What does that have to do with if if there's if there's information missing, what does them proving they provide service to thirty percent of the households have to do with missing information?

Denise

They have asked us to review the application regardless of the deficiency, so that these are the conditions. So where

Moody

in the code does it say that any service provider

Denise

The code basically says that I'm not supposed to even pre bring this to you for your reviews.

Moody

Why would why I'm asking why would such a condition be I I I think I'll

GirardiVice Chair

try to answer your question. I think the consultant was trying to come up with conditions To demonstrate that they're meeting the coverage maps that they submitted. That's the intent of the second condition. Well

GreyChair

Verizon can

Moody

have coverage in my neighborhood, but that doesn't obligate me to be a customer, even though I am a customer.

GreyChair

Well the problem I think there is

GirardiVice Chair

a difference.

GreyChair

The problem the RF advisor is having it seems to me is that he's saying, Well there's a coverage map but how do I know that how they arrived at that coverage 'cause I don't know what equipment they're using. And she you're saying you're not gonna provide that equipment information.

Deborah Martahue

Chairman Gray, if I could speak to that just for a moment.

GreyChair

Please

Deborah Martahue

please make it

GreyChair

brief.

Deborah Martahue

I have been doing this since nineteen ninety-seven.

GreyChair

I don't want

Deborah Martahue

a history

GreyChair

lesson. I just want to know why you can't provide that information.

Deborah Martahue

is that every wireless consultant that is hired by any jurisdiction to evaluate our uh level of service, if that's even allowed, which let's just put that aside, Um they do not have the proprietary software, the methodology, the customer data, the predictive customer data. They are making an educated guess. There is not one provider in the city. How

GreyChair

is he gonna determine whether your map Is there a real map? If he

Deborah Martahue

doesn't

GreyChair

know what what equipment you're using, does it have a

Deborah Martahue

question is how can he determine that for any communications provider? Because he knows

GreyChair

what equipment they're using.

Deborah Martahue

There is not a communications provider. That's a

GreyChair

requirement of our code.

Deborah Martahue

It is

GreyChair

that you provide the question.

Deborah Martahue

There is not but that is not the only thing that goes into it doesn't matter,

GreyChair

it's in there. It's part of our code.

Deborah Martahue

Uh if Chairman, Chairman, that is not the only thing that is evaluated when you produce a propagation map. There is customer data, predictive customer data, there's software methodology, there's proprietary information. There is not a provider in the world. or at least in the state of Florida that I've worked with.

I'm sorry?

GreyChair

Did you provide to him a list of the equipment you were

Deborah Martahue

Yes we did twice.

GreyChair

He says that he didn't get it. Why don't you just provide it?

Deborah Martahue

We did twice.

GreyChair

Drive it there. I don't care how you get it there.

Moody

Submit a copy to the clerk, it's in the record.

Deborah Martahue

Move to

Moody

receive and file.

Deborah Martahue

Thank you. Okay.

GreyChair

Further discussion? All in favor? Aye. Aye. Opposed?

Chris Williams

Can I ask a quick question? Sure. It's a simple question really, I hope.

You say you cannot provide the number or anticipate the number of customers you may have here in Pasco County. How many customers do you currently have in your areas now?

Deborah Martahue

Um

Chris Williams

It's a simple question. Thousands.

Deborah Martahue

It's not a simple question because

Chris Williams

You mean you don't know how many customers you currently have?

Deborah Martahue

We have no customers in Pasco County.

Chris Williams

I didn't ask about Pasco County. I said your total number of customers you currently have.

Unidentified speakerVoice B

What? I'm sorry, I'm sorry, you're asking for a customer.

Chris Williams

I don't care who answers the question, it's a simple question. How many customers do you have on your books that pay you a monthly fee for your service? I'm not comfortable answering that question right now, sir. Okay, thank you. I appreciate that. You you talked about fiber optics. Well well oh

GreyChair

hold on, hold on, John.

Chris Williams

Yeah, you decline you decline. I can just let me wait, wait, you've had a close to an hour and a half. And I've been very patient. You talked about

Connected City

some of the best

Chris Williams

fiber optics. Are you anticipating using fiber optics system and then people have to buy some type of apparatus for them to pick up your service?

Unidentified speakerVoice B

So uh Chris Jeske again for the record. Uh so

The answer is yes but no. Um so the we u we again we use fiber to connect our towers, okay? And then we we place a a radio antenna on the home of the of the subscriber.

Chris Williams

So the people have to purchase either rent or purchase a piece of equipment to obtain your service.

Unidentified speakerVoice B

We we provide that as part of the service.

Chris Williams

Okay. Uh simple questions. Simple person. Thank you.

Deborah Martahue

Chairman Chairman Gray, I wasn't trying to give you a history lesson but tell you that I've represented T Mobile since nineteen ninety eight.

GreyChair

Before they were T M Oak before you represented them. I'm just asking if you complied with our code in terms of giving him the list. You said, Well you sent it twice and he didn't get it. Well send it three times then.

Deborah Martahue

I I'm not the person who transmits it. The staff is the person who transmits it.

GreyChair

You can't blame this our staff. The staff is the one that got the letter for you from the FAA.

Deborah Martahue

That's the right-of-way.

GreyChair

You didn't even have a you had a two-year-old letter.

Deborah Martahue

That that's not correct.

Denise

So I transmitted that information to Mr. Monzingo and that was not sufficient for his review. He actually replied to that and explained how that was not sufficient. So what she's stating that she transmitted, I sent that to Mr. Monzingo.

GreyChair

Right. And then you reached out and got a current current letter, is that correct?

Denise

Um that is another uh another thing when I and I really don't want to get into that, but if you'd like I can't Which is when they first submitted their application, they submitted an FAA determination that was about three years expired. It was from 2020. And I was asked to, I went to the I have it in writing, I could show it on the screen. Um I went I contacted the FAA first by phone then by email asking them if they would please look into it and like probably within the An hour they said that it had already been determined,

and I asked Miss Martahue to access her F that her F FAA record and immediately she sent it to me and they sent me a new determination. But I mean if since you mentioned it.

Deborah Martahue

It had been issued that day. What we submitted, like just like the prior applicant, is they knew their FAA. AA was expired, I don't believe ours was expired by three years. We had applied in twenty twenty and it had expired just before we had submitted and then we submitted an aeronautical study clearing us for those moving

Connected City

on.

Deborah Martahue

Any

GreyChair

other questions?

Connected City

So I I one more that was um Kind of the the other thing I'm gonna think about too. So we just approved another application just up the road. Uh is there any reason why you couldn't co locate with that tower that was just approved?

Deborah Martahue

I guess the question from me would be is there any reason the other um company couldn't co locate on ours when we have been first in line through every part of this application process. We have just had to jump through a whole lot of the right-of-way. I don't think it's not

Connected City

legally required to because you're more than the fifteen hundred foot distance that is required by code, but but just a simple question.

Deborah Martahue

My my answer is Is there a reason they can't co-locate on our tower when we were first in line? You keep saying you're first in line, but you didn't complete

GreyChair

your application

Unidentified speakerVoice B

correctly. Sorry, I'm correct. Chris Chesky for the record, I have another answer for that question. It's because Verizon will be at one eighty eight uh from one eighty eight to one seventy eight on their tower and will be at one eighty five on this tower.

Unidentified speakerVoice E

But isn't their site ten feet higher than your site?

Connected City

I'm uh three feet. Three feet. Right, so th so they're requesting one eighty five.

Unidentified speakerVoice E

I'm I'm talking about the I'm talking about the ground elevation. Three

Connected City

feet. Yeah, one

Unidentified speakerVoice E

one. Not the height of the tower. Not the height of the tower. No, what the

we're doing.

The ground elevation.

The elevations at the first sight are at one twenty and this is at about one ten.

Denise

If I may, the elevation of that tower was one eighty, it's just the eight foot is a lightning rod.

Moody

Still didn't answer Jamie's question. Thank you. He's talking talking about the absolute elevation of the top of the tower.

Unidentified speakerVoice E

So don't you achieve the same thing by being on ground that's ten feet higher with a ten feet shorter tower? If I understand your technology correctly the way you've answered it, or the way you've given us answers?

Unidentified speakerVoice B

Uh yes, but again Horizon would take in the top spot. So maybe we'd be ten feet. I think ten, fifteen feet lower.

Unidentified speakerVoice E

Again, but the absolute elevation would be the same. So just so everybody understands.

But you'd be at the same elevation.

Christopher Poole

So could uh it's so your your coverage map that you showed and you quickly went over it. Um if you could go back to that.

I mean it's you know, the primary propagation is an area that's pretty desolate right now. It's agriculture. So you're taking a big bet on the future. So kinda to to Derek's question about that is is there limitations in the type of pole that you're gonna put in of others co locating with you? You know, for example there's another the monopole option that's that's up the road right there. I mean are they gonna go jump on that before they before they even consider yours given the flexibility of the monopole i mean which

leads to the pinch of liability and maybe that's a better question for the tower operator and

Deborah Martahue

I think and I'm gonna have them come up but I I uh for the record I want to say the closest tower right now is four point two m nine miles away and so even if they jumped on this tower that you're describing they would still need to be in this area and this design would accommodate um any any provider should they want to choose, but I'm gonna let Mister O'Shaughnessy, who operates with all these different providers, as he earlier said, he's for all of them. He's not um against any of them.

Christopher Poole

No, I understand. But we just approved that at tower, so that

GirardiVice Chair

Can I ask a question that may get to the point you're making? Um

'Cause we heard earlier that Towers is not just a coverage issue, it's also a capacity issue. So the question would be Is having two towers in this area I guess my question would all probably be for Verizon. At some point is it possible they would need two antennas in this area for capacity reasons. Can I ask, is it okay if I ask Brian that question? It's okay with me.

Can I it's your it's your hearing. Can I ask you that? Clearly. I'm talking to you you sir, the one you just Yes. Forget your name.

Unidentified speakerVoice F

I'm not seeing my biggest counseling.

GirardiVice Chair

Uh well, whoever's the expert is from Verizon.

James Johnston

I've done this is James Johnston. I'm with Shutzen Bowen in Orlando at 300 South Orange Avenue. Uh I represent Verizon Wireless and I've told him not to answer this because he has not looked at this tower, he has not looked at this area, he has not evaluated anything, he's not here on behalf of them as an expert. So I've instructed him not to answer those questions. Thank you.

GirardiVice Chair

Okay, then I'll ask who's your expert?

Deborah Martahue

As we stated earlier, um we're open to all we design this tower for co locations.

GirardiVice Chair

Okay, but I'm asking I want who which one is your expert in RF in your group?

Deborah Martahue

This this is this is our co-applicant that is a wireless communications provider.

GirardiVice Chair

But I with all the respect we don't have an expert here that can answer that question.

Trying to help you. Would have been. My question was is there a possibility that as this area intensifies in population I don't know if it ever will, but if it does that you might need two towers to serve it from a capacity standpoint, because we heard earlier that that it's not just a coverage issue that when you have enough people connecting to a tower, sometimes you need multiple towers to serve them from a capacity standpoint. That's my question, but apparently nobody can answer. I uh

Unidentified speakerVoice B

well I c I can't speak for Verizon because I'm not familiar with their their their their cellular propagation, their cellular maps and all that sort of stuff, but Logic would dictate that yes, I would expect so. I I'm sorry, but I yes, I believe so.

GreyChair

Uh we have uh this gentleman's been

Unidentified speakerVoice B

Tim

Unidentified speakerVoice G

O'Shaughnessy

GreyChair

patiently waiting to come up and speak. No, they'll only need one.

Unidentified speakerVoice G

All right, that's it. Name and

GreyChair

address.

Name

and address.

Unidentified speakerVoice G

And Verizon did reach out to my

own.

I need your name and address Tim O'Shaughnessy. I don't know who you're who's speaking if you know. I thought you said that. Tim Tim O'Shaughnessy. Thank

GreyChair

you.

Unidentified speakerVoice G

[address removed].

GreyChair

Oh okay.

Unidentified speakerVoice G

Uh this is what I

need

for one tower out here. Number two, Verizon did reach out to my engineer three days ago for a copy of my plans. I've reached out to the manager, never heard back. Um answer your question regarding stealth, uh canisters, canisters. Uh who asked the question regarding canister they can use canisters all day long. I just signed a lease with a Verizon at 6923 and Punta Worta. 18 Ts coming on that same tower tower. I got two in Port Orange on canisters. Won't

go into detail and all that stuff, but they can go into thin labor canisters. Build them all the right place. That's all it's

GreyChair

Thank you.

All right. Are there any other questions?

Unidentified speakerVoice E

I got I got a question for Chris on the counties. Chris? Uh The reason we're here today and the reason denial is the recommendation. Can you go over that again? I mean, wh why is the recommendation for denial? Have you?

Unidentified speakerVoice A

So

Unidentified speakerVoice E

this

Unidentified speakerVoice A

is this is my job for the county.

Unidentified speakerVoice E

Okay.

Unidentified speakerVoice A

It's to basically look at the whether Ms. Downey thinks I can do it or not, this is what the county asked you to do and have done on many, many applications for Basco County and other counties. It's to review the all-depth information that's provided by the house. to determine whether it is at least feasible and yes, yes, yes I can model propagation from every care there is if you provide me the information of the equipment. It doesn't have to be proprietary information. I enter the model numbers and

bound height is not proprietary.

Unidentified speakerVoice D

The frequency band that you're using is not proprietary.

Unidentified speakerVoice A

I have uh coverage modeling software. The model of software. I'm an already engineer who's been doing it for many years, I'm not going to give you a history of lesson easy.

Unidentified speakerVoice D

I asked for specific information on how they generated that coverage map that you just have. Again, yes, they provide information for multiple frequency bands, multiple pieces of equipment,

Unidentified speakerVoice A

but all of that's not used to generate that coverage map. There's one set of equipment, the one set of parameters that's used to generate that coverage map. I was not giving that information, so therefore I couldn't. Rightfully make any kind of determination as to whether

Unidentified speakerVoice D

the

Unidentified speakerVoice A

coverage map is feasible. In my professional opinion, it's not. They're not going

to

get that kind of coverage from the service that they are saying they're going to provide or default equipment they're going to do for. They're not going to get that distance covered.

Unidentified speakerVoice E

Okay, so so I don't know that so

Unidentified speakerVoice D

you give me specific information so that I can run the

Unidentified speakerVoice E

book. Okay, so during the review process you reviewed what they submitted you went back to them and you told them that the application is deficient because of X, Y, and Z and you've given them those reasons, correct?

Unidentified speakerVoice D

Uh well so like you was talking you said it's anything on either area, I passed my information to uh Ms. Hernandez, she passes it all.

Unidentified speakerVoice E

Okay. And and when they were told that items were deficient, how how did we get I I I I submit stuff to Rosella every day, okay? I I haven't had one submittal yet where I submitted stuff and I was waiting on comments back and I got immediately I got a denial. They come back to you and they say there's stuff missing. Provide the missing information. What what I don't understand what the disconnect here is if the If you were told stuff was missing. Was it not provided? Were you not told? I mean we don't just go from from A to Z without something happening in the middle. How do we end up here at

Denial?

Deborah Martahue

I I have a deficiency letter um from let's see March twentieth, which were primarily technical. March

Unidentified speakerVoice E

twentieth. Yes. We filed on March You're talking content deficiency, not review. There's two different you understand the process. You go through content review and then after it passes content review, then they do the technical review of the document.

Deborah Martahue

I understand we resp we responded. to w we gave them all the information that's required by code and I guess It's seems like a very hostile environment here. Um He asked questions, we um responded I responded actually three well the third time I said I've already responded twice. We gave the technical data sheet nothing changed he uses multiple types of equipment

different spectrum it is different from say a Verizon um I I can't I I don't know what's going on with Mr. Monsinga and his evaluation.

Unidentified speakerVoice D

But

Deborah Martahue

uh

Unidentified speakerVoice D

depending on the easement he provided one coverage map. I asked for the specifics on that coverage map. He he can use seven hundred different pieces of equipment. He used one set of equipment to produce that coverage map. That information specifics I did not receive. But isn't it

GirardiVice Chair

isn't the coverage matter? It actually isn't and I um with all due respect to you when you keep saying that, it matters when they get to When they start having service all over the county it does matter. I understand that. Because whether they have a gap in coverage is something you have to consider.

I understand that, but he our consultant has to he's asking for this information because he needs to know on a consistent basis, he has to evaluate coverage from He may be right for this very first one, but he can't set a precedent that it's okay to not give him this information. Because he's gonna need it to determine whether there's a gap in coverage when the next one comes in. So you can't say it's moot.

Unidentified speakerVoice E

Just like for the landscaping, there's an ordinance and there's a code. Just like it has to be applied for the landscaping, and you have to follow the rules for the landscaping. You've got to follow the rules for what the code requires to be submitted for this application. Yeah.

James Johnston

If

Unidentified speakerVoice E

it hasn't been submitted, I'm assuming that they were told that there was stuff missing, And then I'm sh I'm assuming that at some point When they were told the stuff wasn't missing, they probably said, Well, we can't provide that. Well then they were probably given the option of w either denial or provide it. And they probably s came back and said, We'll go with denial. I mean I don't think I've heard anything today saying that this isn't needed that that They should be a little bit more than a little bit.

Christopher Poole

So

Unidentified speakerVoice E

w it's it's a procedural issue and we're sitting here talking for an hour and a half. I'm sorry if it seems hostile. But it is hostile and I sit here for an hour and a half and I hear fingers being pointed in different directions saying we did it but we didn't do it.

Deborah Martahue

But we followed the code.

Unidentified speakerVoice E

Ha. Okay, you said you followed the code, he said you didn't. Who's right? That's what I'm talking about about finger pointing.

Unidentified speakerVoice B

I there's your code.

Unidentified speakerVoice E

I no, because I'm not an expert. I don't even know what this is you gave us. I have no idea.

Christopher Poole

So are you saying

Unidentified speakerVoice E

you didn't give it?

Christopher Poole

Are you saying that the what you submitted, the information you just handed to our clerk, is will allow him to assess the coverage map

Deborah Martahue

Yes. It a point. The problem

Moody

that we have here is that we have a code that has a checklist that says they need to submit information to justify their height request. But we also have a code that contradicts itself right here that says That's not part of what we're looking at. We're here to look at things from a land use perspective. from a compatibility perspective, not whether they provide adequate service, not whether they can provide it for ten miles from

here. We're trying to determine whether this is a blight on the landscape. That's what this comes down to. Which

Connected City

we have zero residents that are objecting to it.

And it's probably going to provide a needed service to those residents around there that don't otherwise have

GirardiVice Chair

service. I So to be I don't know in the Telecommunications Act though you do have to consider whether there's a gap in coverage. Because it it it it goes to the issue of is there you have you effectively denied coverage. Okay, so So they have no coverage. We have no coverage, so there's no cap or curry. Then are you going to approve this one on the condition that the next one where they have to prove there's a gap in coverage, they're going to give us the information? Because that's what the consultant has to address. is you may be right for the very first

one. Okay, the the very first one you don't have to work.

Moody

sorry 'cause I'm not trying to tell you how to do the job, but The ordinance needs to get fixed. I said this the last time we were in here with With Matinaya's case that we have an ordinance that's outdated, it needs to get fixed. These are things and I understand what it's like. You can't think of everything and every possibility when you create legislation. But now we've got an exception. That's why we have a hearing. It's this out in the open, okay. And now some changes need to happen to the ordinance to make sure that we've got something that works. It's

it evolves. It I think it ev doesn't even say somewhere in our land development code or in the comp plan that this is a living document, that this this the code evolves to I think it's on the planning department website. We we

GirardiVice Chair

routinely make changes to our code. That's an accurate statement.

Denise

Yeah, I think that's in the ODT section. Okay. So I just

Connected City

it's not fair that a small business is trying to provide a needed service falls victim to a hole in our code. I think that's kind of where at least where I'm at.

GreyChair

Well where I'm at is if it was this simple for you to walk this over here and give it to us and say, This is the answer to your questions. Then why didn't you just give it to the guy? You're saying he got it? He didn't get it.

Deborah Martahue

I didn't get uh that response is in response to the staff report that I had that wasn't even included. It wasn't even included in the staff report. I had to ask for the analysis and all the attachments on July twenty sixth.

Unidentified speakerVoice E

So you you weren't told that you were gonna get denial until you saw the staff report?

Deborah Martahue

I didn't know on what basis. And I had to ask for attachments. They weren't included. Look in your agenda. Those attachments weren't even included in in in the report. I didn't get the final, I didn't get the staff report or the final that included his analysis until July 26th. And we had all these other issues. I'm here today giving we had to go through point by point and analyze it and submit it. We did the best we could in the time that we

were given.

The um I I I I need to wrap up that on the federal telecommunications definition, it says that personal wireless services include unlicensed wireless services. And then it talks about on licensed wireless service means offering telecommunication services on duly authorized devices, which we explained. And it doesn't include satellite, which is a which is consistent with your code. Your

code exempts the whole satellite issue. And then you there is discrimination when you are discriminating. Between the different types of communication services providers. We are a new service in Pasco County. It would be an effective prohibition for us. Um, and I I I'm not gonna talk to every other provider, but I think it's kind of obvious if the nearest tower is 4.29 miles away. You got issues with communications. I know every single time I've been out there I

have call fail. I can't even send a text. So there is all manner of communication problems in this particular area. You have a distribution and an employment center coming online and People are trying to be proactive to have As Matanaya John mentioned, just like concurrency, you're trying to be online before you have a problem. So I I do agree with her on that. Um e other and I do appreciate your

time. It just feels Like because we're new and maybe some of this has been unfamiliar. Did

Connected City

you say you had a list of conditions that you would like to see?

Deborah Martahue

I asked um just for the first three to be deleted because they're not your standard conditions. Um I've never seen them in any resolutions related to communication facilities and I asked for the last five years from the clerk's office and they kindly gave them to me which I have furnished in uh electronic format. Because actually that's part of your record anyways, anything that's been passed by um your Board of County Commissioners

GirardiVice Chair

So making

Deborah Martahue

sure

GirardiVice Chair

to be clear wrong.

Deborah Martahue

This thing doesn't

GirardiVice Chair

So I I don't know where she's at on time, but we haven't finished this public hearing because you've not heard if there's anybody in opposition yet. So I

Deborah Martahue

I'm trying to

GirardiVice Chair

get back to the

right-of-way.

No, we're not doing that. We have not finished the public hearing yet. So I don't know.

Deborah Martahue

So that was the conditions. I was just asking for one one, two, and three to be removed. We're fine with four through I think twelve. And obviously I'll leave it to the board. If you prefer Monocle, we're fine with monopol. We need the setbacks regardless.

GreyChair

We're not voting on that yet. We're gonna hear from the public first.

Deborah Martahue

Okay. And then I'm sorry. Do you

GirardiVice Chair

know what your presentation? Yes.

Deborah Martahue

Sure.

GirardiVice Chair

Okay.

Deborah Martahue

May I come back if there is opposition?

Thank you.

Unidentified speakerVoice H

Excuse me Mr. Chairman Ms. Marty Hughes submitted documents electronically to the clerk's office. Would you like to receive and file those?

Connected City

I we did already.

GreyChair

Yeah, I think we did electronic

Unidentified speakerVoice H

electronics you did.

GreyChair

Yeah. Motions are received. Second. All all in favor? Aye. Aye. Thank you.

All right. Are there any is there anybody in the audience that would like to speak? In in in opposition.

Yeah.

Unidentified speakerVoice I

I'm Matt Tania John, 935 Main Street, Suite C4, Safety Harbor, Florida, 34695. I don't know if I'm supposed to fit somewhere else in the speaking term. I'm not substantively I'm appearing on behalf of OneSource Towers 2. I am not substantively objecting to this site as I stated in my own matter. We stand in the light of our own day, but because Ms. Martahue has availed herself of the um of our record, we are I

am maintaining standing in hers, just to avoid the possibility of malpractice. To the extent that Ms. Mardihu has stated uh that there's a state shot clock, it may help the tribunal to know that that's at 365.172 sub 13 D1. It has two stages of counting. There's math to be done there. Um anyways, that is all I have. And if I may, I would like to go home.

Thank

GreyChair

you, Commissioner. Thank you, Mr. Chairman. All right. Anyone else? Yeah.

Do you have any rebuttal uh for the applicant? Is there any rebuttal? I don't know what you would read but

Chris Williams

No.

Deborah Martahue

Yeah, I understand.

GirardiVice Chair

The only testimony she offered was about a shot clock. So hopefully that's the only thing you're rebutting.

Deborah Martahue

Uh and I just want to clarify that the first part of the shot clock is with respect to which I had this conversation. I'm sure. And they

GreyChair

still need your name.

Deborah Martahue

I'm sorry. It is Lee. Deborah Mortahue, Martahue Landley's Law. Uh just Mr. Gold scene, we had this conversation about the shot clocks in the statute, which is why we're on the statute. It's two parts. One's more procedural, the second one well there's two procedural one is whether or not your application is complete and then when final decisions need to be made uh within a certain time frame and we are just falling in that time frame and just

Moody

The statutes also says that the parties can mutually agree to waive those time frames too, right, Mr. David? Yeah,

GirardiVice Chair

but they'd have to agree. But we th they're hearing this today because they requested this hearing date and the you acknowledge it meets the shot clock, correct?

Deborah Martahue

I did.

GirardiVice Chair

Okay. So There's no issue with the shot clock. Today's hearing needs that

Deborah Martahue

I would just clarify. I'm not arguing. I'm just clarifying.

I I just need to clarify in the conditions.

GreyChair

This is re this is for rebuttal now, not presentation.

Deborah Martahue

Oh wow, You made

GirardiVice Chair

it

GreyChair

clear earlier.

GirardiVice Chair

You said you want one through three deleted.

Deborah Martahue

One through three I I didn't know if you were gonna follow with an executive session, so I just wanted to clarify if any notion was.

GreyChair

We we we

GirardiVice Chair

operate under the sunshine law.

Deborah Martahue

No no no no before you move no when I said executive session I meant when you closed the public hearing. I didn't know if I'd I just wanted to clarify the types of conditions of approval, that's all. Because usually you

GirardiVice Chair

stayed earlier you wanted one through three deleted and you were okay with four through twelve, right?

Deborah Martahue

Correct. And we are open to um if it's the preference of the board

GreyChair

or One and it's enclosed.

Deborah Martahue

Correct. And if it's the preference of the board, recognizing that the the property is very heavily wooded, you can't even see in there. We certainly would be open to a waiver of the landscape requirements.

Or doing I didn't finish, or doing the alternative standard application for that review just as an option.

GirardiVice Chair

Okay.

What I said is that you could apply for that at site plan approval.

Moody

Okay. I think

GreyChair

you've had your turn.

Unidentified speakerVoice G

Tim O'Shaughnessy [address removed]. Thank you guys. Thank you. Thank you. Thank you. I didn't realize that we didn't see those conditions of of approval until the twenty-sixth. That's the first time I've heard it. Um but I appreciate it.

GreyChair

Yeah, I mean I I I wanna assure you that in conversations we've had, the staff has gone way above board to try to help get this to the point for you and your company and I would not personally I I don't know how the rest rest of the staff feel, but typically I wouldn't have an objection to your request except for the fact that the application was incomplete and that's why it was recommended for denial. So I mean I I I feel

like uh your representative has taken you know offense at something that she should never have taken offense of. That's why I walked up. So all right.

Unidentified speakerVoice G

Thank you very much. So with that said, I wish we were number two before then, but we're last so hopefully

GreyChair

that's okay.

Probably wore us down.

Unidentified speakerVoice E

And again, for clarity, I don't think it matters whether the other site was approved or not. We've already talked about that. So you keep saying number two, number one, whoever's there first. That has nothing to do with this. Yeah, that would

be a good thing.

Just to be clear.

GreyChair

That wouldn't have any

GirardiVice Chair

effect

GreyChair

on my decision.

GirardiVice Chair

I know that. That's why I asked the question of whether there might be a need for two of them in this area. Well that's why I answered Crap of the Chus.

GreyChair

Yeah. So I don't know how the boat's gonna go but it'll have nothing to do with the fact that the other one was approved. Well

Unidentified speakerVoice G

appreciate the time. Okay.

GreyChair

Thank you.

Okay. I think we've reached a point where we have to make a motion and vote.

GirardiVice Chair

I have one I have I just want to make one comment. So I it's up to the Planning Commission about whether you approved or denied this. The only thing I would ask is that And if you want to delete conditions one, two, three, I don't that's up to the Planning Commission. I would ask though that if you do approve it, that there be a finding that did not set a precedent for Two this form of application is acceptable for future applications because my fear is that that with all due respect to Mr. Moody,

I do think that coverage maps and these and the validity of the coverage maps is relevant. And it may not be relevant for this one because it's the first one. But if you say it's irrelevant or moot They could put up eighty towers in this area and say It doesn't matter what my coverage is, right? At some point our RF engineer needs to be able to demonstrate that I agree with you. That that

Connected City

I agree as well.

GirardiVice Chair

So you can't that's my concern here is the precedent this is setting is that you don't have to give our RF engineer the information he needs to determine coverage.

Moody

I agree with you. But what I believe we have is Pardon the pun. A communication problem between the RF professionals here. um as to what constitutes the sufficient information to figure that all out. I think one guy's got an opinion and I can tell you this,

I've been doing civil engineering now for almost thirty years. Hear me I don't see nothing now. I don't need I don't need a calculator to tell me that if I have a quarter acre that's paved ninety percent of the way, that it's gonna be an F D. O. T. type inlet with a fifteen inch pipe coming out of it. I've done it so many times, I don't Yes, I can go in the F D O T drainage manual and it says I need to have Manning Zen and I need to have the slope and I and you know what the answer is

gonna come out the same every time. So I don't necessarily just because the ordinance says you've got to provide A, B, C, D, E, F, and G, I don't know that all that is always necessary all the time to prove your point or to prove the case.

Connected City

Especially in this case.

Moody

Especially in this case because this isn't they're not This isn't a proposal. It may there may have

Connected City

some I I don't think we're just capitalism will sort it out as well because if there is coverage holes then people will come in to try to fill those coverage holes. If there's no coverage holes then there won't be a need for that service. So it kind of sorts itself out. I understand the need for the ordinance. I understand the I

GirardiVice Chair

mean an ordinance does d does discourage a proliferation of towers.

Connected City

from pure capitalism standpoint. So you're you're not gonna build a tower where it's not needed.

Well so that's that's the question. Well I

Unidentified speakerVoice A

I'll be suggest as your expert um No disrespect. I look at the map and tell them that it's a cham, which is why I request the additional information. I don't need A B, C, D, and E to know whether the RM map is uh a legitimate map or not. So uh that's why I asked for this more information so I think about approving

Unidentified speakerVoice D

the other

Unidentified speakerVoice A

one. But

Unidentified speakerVoice D

I'll I'll I'll leave it at that and you gotta move on.

Unidentified speakerVoice E

There's there's a reason why there's a process. There's a reason why the county uses a RF engineer to review the submittal. None of us up here are I I I'll take that back. I'm not a v I'm not I can't review their application because I don't know what it even says. Okay? I'm not an expert in the matter. The county hires an expert in the matter. I think we're setting a dangerous precedent. I think we're really s overstepping our bounds by approving something that has not gone through the channels and the levels of review that the code requires it to

go through. So that's my point.

Chris Williams

I can compare with that philosophy too. I think we all do in some respect because we know that there is a process. And it's fair when all of us play the same sheet of music or we all use the same rule book. And I think that's what we're trying to say here. And therefore I'd I'd recommend that. I'm s I'm proposing no. I'm Making a motion that we deny the request per county's recommendation.

GreyChair

It's almost like a double negative. You're act you're actually making a motion to approve the county's recommendation of denial.

Chris Williams

Denial. Denial. Did I not say denial? Well you knew I understood what you knew what happened.

Unidentified speakerVoice E

You said we were gonna deny it.

Chris Williams

Not we. I mean dying

Moody

I have a question for David. Yes. If this Application is denied. Is there anything that stops them from resubmitting their application tomorrow morning at eight a m? So

GirardiVice Chair

I would go one step beyond that. You're a recommending body. Okay, so

Moody

okay.

GirardiVice Chair

So you in theory could recommend denial they may be able to between now and the board meeting to get Chris everything he needs to maybe we're sta staff could actually issue a different recommendation to the board if they have It Chris has all the information he needs. Point well taken.

Chris Williams

And that goes to my question for Denise. Did I hear you say there are other Towers that have similar service that have already been approved in Pasco or did I misunderstand that?

Denise

I'm I'm not sure I don't know.

Chris Williams

Well in other words this is this seems to be a unique new thing, but are there did I hear that other towers have been approved that maybe aren't just cell service but some other

Denise

I think the applicant mentioned that in one of the resolutions that was provided.

GirardiVice Chair

Okay. Are you aware of one that we've approved its Not

Denise

That's not the major carrier?

I think we may have done one not major carrier, but I'd have to go back through the records to see which one it is.

Chris Williams

I guess my point is that we're going to be able to do it.

Denise

So yes, I think we have done. Within the last five years of the request that were made, yes, I think there was one. Okay. Thank you.

Unidentified speakerVoice A

I also think there's a good chance that maybe a utility and or a public safety agency there requested a tower for their communications. I don't know, I haven't reviewed any. This is the first one that I've reviewed Pasco County that was uh a witness

Unidentified speakerVoice D

for a non-major carrier.

Denise

I see what you're saying. So you're saying that like the Duke Energy, for example, towers. Okay. Yeah, that's accurate. We have approved a Duke Energy.

Yeah, we've had two within the last five years from Duke Energy.

Chris Williams

Mr. Chair call for a point of order. I need a second on that motion or denial.

Unidentified speakerVoice E

I'm in complete agreement that that a tower is needed out there. I'm not in I'm not saying it's not needed. I'm just I'm not comfortable stepping outside the bounds of doing giving some kind of approval with conditions when we're not even the experts to do that. So I I'll second the motion.

GreyChair

Okay, so we have a motion and a second to approve the recommendation for denial.

All in favor signify by saying aye. Aye. Aye. Opposed, like sign?

Moody

Nay.

GreyChair

Nay. Okay, I believe that motion carries.

You want to

Chris Williams

phone

GirardiVice Chair

call just to get the numbers? So you Yeah we could do the roll call.

Chris Williams

Because I did not vote. I don't think I'd vote

GirardiVice Chair

unless there

Chris Williams

was a

GirardiVice Chair

most at the time. But let's let's so there's an accurate number, it wouldn't be a roll call.

Unidentified speakerVoice H

Okay. Mr. Jamie Girardi.

Unidentified speakerVoice E

I approve the denial. Aye.

Unidentified speakerVoice H

Mr. Derek Pontlitz?

Unidentified speakerVoice E

Nay.

Unidentified speakerVoice H

Mr. Peter Hensel?

Unidentified speakerVoice E

I approve the denial. Yes.

Unidentified speakerVoice H

Mr. John Moody?

GreyChair

Nay.

Unidentified speakerVoice H

Mr. Christopher Poole?

GreyChair

Aye.

Unidentified speakerVoice H

And Chairman Charles Gray.

GreyChair

I approve the denial.

Unidentified speakerVoice H

And that is four to two.

GreyChair

And I'm hoping that You can take this information that you just handed out to us and get it to the RF analyzer and maybe before the next meeting you can get it resolved. Be because as the attorney points out, we're only making a recommendation. So it's not decided.

Okay. Anything else?

Denise

Four to two.

GirardiVice Chair

Four to two.

GreyChair

Yeah. And I think that was a sympathetic word or two. I think if the application had been complete in our opinions, probably would have had a unanimous vote. But it wasn't. So we don't want to set a precedent.