Not on the published agendaPublic hearingInferred

Seven Diamonds Commerce Park MPUD PDD 24-7649

What the county recorded

This item is not from the published agenda

It is a stretch of the recording that this archive identified as a separate matter — a call to order, a recess, or something taken up that the agenda does not list. There is no official title, no staff recommendation and no disposition, because the county never recorded one. Everything below is inferred.

What was said

Transcript

Machine transcription of 24m of recording, with speaker names inferred from voice matching. 89% of 114 lines carry a name. It shows what was said, not what was decided, and both the words and the names can be wrong.

Read it in the meeting →
Amy Heiler

She's not sure.

Good afternoon, Amy Tull with Planning and Development. The item before you is Seven Diamonds Commerce Park M PUD in the name of PDD 24-7649.

The proposal is a rezoning application from R2 Low Density Residential to MPD master plan unit development to allow for the development of light and heavy industrial uses on 188.71 acres. It is located on the east side of Highway 41, approximately 4.5 miles north of State Road 52. Here is the general location. It is located in the central market area. uh

the aerial map view of the subject site. Current zoning is R two. And the existing future land use is currently Res One, residential one dwelling unit per gross acre. There is an accompanying comprehensive plan amendment that was heard a few months back proposing this area to PD Fu PD flu.

Here's the master plan that accompanies the Seven Diamonds Commerce Park as well. As you can see, the certain heavy industrial uses are going to be centralized to the interior of the project scope. I have highlighted here the light industry being on the south and the north, but I also want to make note that the entire project is also just planned for light industry. So the heavy industry Industrial uses will be set back at least five hundred feet from the north and up at at a minimum of

three hundred feet to the south where the wetland is located.

So the applicant is seeking the following variations from the land development code being LDC section 901.6 D11. The applicant is requesting relief to provide connections to the north, east, and south. For the reasons being the north is a platted subdivision, the east is an existing CSX railway, and to the south there's a Category One wetland. Additionally, section 805.6 This is

in place to put the maintenance responsibility of the wetlands and the upland buffers under one entity. The applicant has recommended or requested to put it under a reciprocal easement agreement, which does still uphold the intent of the code of under one entity. And lastly, section 1105.2 for landscape buffering, the applicant is requested. requesting relief to eliminate the internal landscaping buffering due to it being an industrial site. So for those reasons,

staff is amenable to the requested relief. And with that, we recommend approval with the conditions of the requested rezoning petition to the Board of County Commissioners. And I'd be happy to answer any questions you may have.

Charles Grey

Okay. Do you have any questions from the Dice?

Connected City

So the landscaping on the outside of the um project is still gonna be maintained, or the buffering is still gonna

Amy Heiler

be maintained. The landscaping to the buffer to the outside is still gonna be maintained. They are requesting relief against the CSX railway.

Charles Grey

Any any other

Amy Heiler

questions?

Charles Grey

Okay, if not, uh is the applicant present?

Barbara Wilhite

Good afternoon. Barbara Wilheit, [address removed]. Great to be here. Congratulations, David. I didn't know that you got an award last week and Elizabeth. I hired them both.

Connected City

You would have had to be here at nine o'clock to find that out. Apparently we need to

Jaimie Girardi

give Barbara an award.

Barbara Wilhite

The uh we were here before for the the transmittal of the Complant Amendment. That Complant Amendment was approved by the Board for Transmittal and went to the state and came back with no um no comments. So we're here with the MPUD. Regarding landscape buffers, we actually put those, the external ones are on the face of the MPUD, trying to be very clear with what our setbacks will be, what our landscaping will be, where our uses will be. We applied for this in January twenty twenty-two. Yeah. So we've been working at it um and and really for all of a lot of the questions

that that the uh neighbor has asked, well not a direct neighbor but somebody in the in the community Um we worked very hard on conditions that I have not seen on any other uh project, especially for our our our heavy industrial uses. We don't have all heavy industrial uses. We don't have all of I2. We have a select few heavy industrial uses that relate to where this project is. This project is across from Seven Diamonds Mine. Um, that's a Lime Rock mine. And so the there's a high demand

to take materials from that mine and take them across the street to this location and use them to manufacture. We all need and we all use, um, if not in our house today, but in our children's house they want to build tomorrow, or a relative that's moving to Florida and building. So these are these are necessary products to be produced. This location is ideal because of the um proximity and the trips. Because these these trucks are gonna go somewhere, if

it's not this facility, they're going to be making more trips on the road. Not only that does that put more trips, trucks on the road, it also increases the price of product that we would that we all have, that we all would experience. Not to forget that we do we are in an area where we want to make sure that we're good neighbors, and I can tell you that the county attorney's office, we have written the most unusual conditions that I've ever seen in all my years to make sure that we have double enforcement authority. So not only do we have stringent DEP permitting, which I

have our our expert consultants, who's one of the best that I've ever met, who does this for a living, is is permit these types of facilities. Um but we have also added them into the county the county zoning ordinance here so they can be enforced by the county if for some reason the state doesn't enforce, if for some reason our users aren't following the rules. So I have my full team here. I think my client was feeling a little ill, so but I feel very strongly that we can answer any questions as a team and um

we look forward to your uh support hopefully and appreciate all that staff has done to uh work with us. on getting to this point. Thank you.

Connected City

All right, thank you, Barbara. So just out of curiosity, it doesn't really matter, but um Does do your client does your client foresee accessing the rail? Uh

Barbara Wilhite

I don't know. And you know there's there's There's our near future. And then there's a longer future. And so I think in the near future maybe not, but We usu you will see that this property will evolve over time because eventually the Lime Rock mine will um build out and expire and and then and then as you build these c these facilities tend to locate where people are building. So I think there'll be another life of the of the product of of of

this project over time and I think that proximity to real. And that's why we did no landscape buffer on that side so that we can allow that to happen, you know, if there's a demand for it.

Connected City

That's kind of what I figured. That's why I was asking so It I think the location's great.

Barbara Wilhite

Thank you.

Charles Grey

Thank you, Barbara. Okay. Anybody here that would like to speak or have questions?

We can have your name and address, please.

Stephanie Shatzman

Stephanie Schatzman, [address removed].

Charles Grey

Okay, and Stephanie you've been sworn, right?

Stephanie Shatzman

Yes I have. Okay. Seven Diamonds Letter on hearing dates had September twenty-one for planning. I showed up only to find out it wasn't true, sending an email to planning the same day asking for the dates and answers to numerous questions with a copy of Seven Diamonds Letter resulted in no response. I followed up a week later and received the dates. I am still waiting for answers to my questions. This is the norm. Lego Verde owners originally wanted to build million dollar homes around the lake. Pasco County sacrificed

the area for approval of a limestone blasting mine to avoid a Burt Harris lawsuit, even though they were fan financially imploding and they went bankrupt eleven months later. Planning uh Pasco Planning 2011 report states under recommendation that future expansion of the limestone mic mining activities should be discouraged or prohibited in order to maintain the vision and character of the area as well as protect the ecological form of the area. The opposite

happened. doctor James P. Gills Jr. and Lou Friedland, the rich guys, were approved in twenty seventeen for a limestone mine. Now those two are back wanting heavy distress industry in the form of a concrete plant that is requesting wells and septic tanks. Crossbar Wellfield abut abuts the entire eastern boundary of the proposed contract concrete plant. Just like the mine.

That adverse impacts caused by heavy industrial use are managed by the state agencies and thus citizens are basically on their own. According to PASCO 2050 Comprehensive Plan, Objective 1.6 Groundwater and Surface Water Protection, it states to preserve the well fields by eliminating potential adverse impacts to groundwater from adjacent land uses. Soning shall only be allowed upon the condition that no land use that meets the

definition of industrial shall be permitted within such zoning areas. The concrete plant is heavy industry, so 12 states, a subdivision with properties of less than two acres needs a central sanitary sewer system, but Pasco is allowing septic tanks and wells. Crossbar Well Field over four months has pumped on average 20 million gallons of water per day. A concrete plant is not compatible. Okay, we may have pollution.

There is no fire alarm air alarm system out there. The fire department is eight miles away. Through Friedland's various businesses he generously donates to commissioners. Do we ever stand a chance? And where is Pasco's protection from the impacts to the aquifer, our wells, the pollution, the noise, and traffic? This may be business as usual for Dr. James P. Gills, Jr. in Friedland, but we want the same protection and peace they have at their homes. Thank you.

Charles Grey

Anyone else?

Okay, no one else is speaking on this, so Barbara, would you like to respond?

Barbara Wilhite

So, yes, we had a notice letter that uh went out with the comp plan that noticed the date of the MPUD before this body that we overlooked that we noticed the re this MPUD with the zoning, the MPD dates changed. We overlooked that. We did send out notice of this hearing to everybody as required with the with the date. That's what happened. And I think staff ended up continuing it that day, walking on and continuing it to today. So apologize for that, certainly

not trying to do anything wrong or hide anything and was no we were noticed for today. Crossbar Wellfield is on our west and I will bring up Gary from ECT. He answered this question um before and Ms. Shotzman heard the answer, but she has still citing the same things. So we'll have him repeat the answer with regard to the proximity to the well fields, the protection zones. A lot of people like to stand up and and and cite comp plan to you, but comp plans are implemented in codes. And this Complant

policy you have a groundwater protection ordinance, um which Gary's gonna explain to you how that what that ordinance shows as far as mapping of that well field relative to this property. And with regard to water and sewer, the utilities department has advised that the nearest um w nearest water and sewer are more than one point five miles away, with uh water being four miles and sewer being two point seven miles, which exceeds the distance to require us to hook up in the comprehensive

plan under table 101. Let me I didn't hear anything else I needed to respond to. A lot of it was ha was personal attacks against my client and um his project across the street, which

Um I don't have not heard any complaints about that project across the street. Everybody's noticed heavily regarding the blasting over there.

Yes, Lago Verde is not owned by my client. My client does own seven seven Diamonds Mine, which is adjacent to Lago Verde. Right. Let me have Gary explain the

Charles Grey

refill. Before you do that, let me just uh So so that everybody who might speak at a on at a future item Um knows that I'm not sure. our timer is set for three minutes. It'll go off in two minutes just to let you know that there's a minute left. That's what that beep is. first one goes off that you gotta quit talking. So I wanna make sure you know that you've got plenty of time. The other thing is I I just want to say this because it

you know, I it She her comments. When you make a person personal attack against people, it doesn't help your position at all. And uh so let's try to stick to the facts. Yeah. She she I don't know, she left so she didn't want to hear what you had to say I guess. But uh Um let's try to do that. You know, just respect each other, okay? So thank you very much.

Name and address and and uh you you've been sworn, right?

Gary Ubelauer

Yes, my name is Gary Ubelauer. I'm a principal engineer with environmental consulting and technology. Address is fourteen oh eight Northwest Shore Boulevard in Tampa. And I have been sworn. There are two responses or or two answers Two her comment or question. The first is that it's well documented. that the direction of groundwater flow Beneath the well field. And the commerce park. is

to the west or to the coast. And so the Commerce Park location would not naturally flow towards the well field, just the opposite would occur. Um so as a result, the potential for the Commerce Park to cause issues with the well field. is contrary to s to the knowledge of the of the science of how the aquifer works. This is demonstrated

and supported by not only your comp plan but your groundwater ordinance. that that provides well head protection zones. around each well in the well field. That Restricts uses and is designed to to protect each of those each of those individual wells. And those zones extend outward. depending on again the groundwater flow. Uh and so they're not just a circle,

they're kind of uh oblong shape. Yeah. And the Seven Diamonds Park is located well west of any of those protection zones. So You know, that says that staff in concert with Water Management District staff have looked at the well field And have mapped where protection is necessary. And determined that this site is beyond those protection zones. I'll

be happy to answer any questions.

Charles Grey

Okay.

Christopher Poole

Do you have a sense of just out of curiosity what your consumptive use is gonna be under you know what what's proposed there from your past experience on Other sites?

Gary Ubelauer

Um It would depend on the mix of uses actually. Uh

Christopher Poole

but you're talking about a concrete a batch plant or or something like that. So just generally based on your your experience and

Gary Ubelauer

Mm. It would you know, it'd be on the order of a million gallons a day. Okay. Something like that. Okay.

Christopher Poole

Thanks, sir.

Charles Grey

Mm-hmm. Okay,

thank you very much.

Jaimie Girardi

I

Charles Grey

think

Jaimie Girardi

she's raising her hand to speak. Pardon me? I don't are you raising your hand to speak?

Charles Grey

Do you want to speak? Okay, well he should've come up with the Yeah, I appreciate that. We we just what we do normally is we you know, invite the applicant up to s to speak, give their presentation, then anybody who has concerns, like you, might maybe. Uh would come up and restate those and then they'd have a chance to respond. So we're going out of order here a little bit, but that's okay. We can work with it. Okay, I'm sorry. I just need your name and address and know if you've been sworn.

Unidentified speakerVoice A

I'm Mary Cornitas [address removed]

Charles Grey

in

Unidentified speakerVoice A

[address removed].

Charles Grey

And

Unidentified speakerVoice A

you've

Charles Grey

been sworn?

Unidentified speakerVoice A

Um what does that mean?

Charles Grey

Did you stand and swear?

Unidentified speakerVoice A

Back there or not. I could do

Charles Grey

it right now. Did you stand and raise your right hand?

Connected City

I don't think she's been sworn.

Unidentified speakerVoice A

Okay, so what would you like me to do? So

Connected City

let's get sworn

Charles Grey

then.

Unidentified speakerVoice A

Okay, sure.

Clerk

Do you swear affirm the testimony you're about to give is the truth, so I'll be back.

Unidentified speakerVoice A

Yes, I do. Okay. Thank you. Thank you. And I appreciate you all allowing a forum for the citizens to speak. So I'm on behalf of some of the residents in my community. Um in the in the in regards to uh

Uh they she asked me to r say that we request that they cease and desist the continued plans to build with the lack of infrastructure. This is in regards to the wells that are drying up in Zephyrhills Uh they are no longer in a position to continue building without providing the sufficient ways to accommodate the necessary infrastructure prior to all. that they are bringing into the county. Um I also wanted to bring

up um I'm reading a book. Uh I I actually read four books about the environment and I'm a conservative, but I really believe that we need to pay attention to what's happening to our environment, especially here. you know, in Florida and um I'm really reading a great book by Jeff Goodall called The Heat Will Kill You First. So and I'm concerned about our future generations in Florida if it will be a habitable place due to our you

know, the continued uh trees that we're cutting down, how we're affecting our water sources and the heat and things like that. So it does mention Pasco County in this book, which had me a little alarmed and um You know the You know, the reality of all the growth here and and what are we doing to protect our water sources? You know, and and you know, just the environment in general, it's a scary

thing. And I think it's something we regardless of our of our ambitions or political opinions and things like that. I I think it's just something that we really need to put, you know, in the forefront. Secondly, um How many people in Pasco County have died of a heat emergency this this year? Those are statistics that are important for us to consider. Okay? We need to pay attention to this as responsible citizens. Thank you.

Jaimie Girardi

Thank you. So Mr. Chair, I think you do need to give the applicant a chance to rebut again. Barbara.

Barbara Wilhite

I don't have anything necessarily to say. We're still available if you all have any questions.

Jaimie Girardi

So Barbara, do you have a question? Um or for you or Amy. Condition twenty four.

This may just be a typo numbering issue, but it says In lieu of conditions twenty four through twenty-seven. The project may be served by Well and Septic. I Is that supposed to say in lieu of conditions twenty five through twenty seven or twenty five through

I'm not sure what it's supposed to say, but it I don't think it should say twenty-four through twenty-seven because they're not going to be able to do that.

Barbara Wilhite

The seven.

Jaimie Girardi

H just say twenty five to twenty seven. Twenty five to twenty eight.

Barbara Wilhite

Well twenty eight. Let's see, hold on front.

Jaimie Girardi

Well twenty eight only applies.

We're only for applying or for providing water and silver. And or reclaim water. So it should probably sit say twenty twenty through twenty

Barbara Wilhite

eight.

Thank you for catching up.

We can certainly fix that. No, steckst. Thank you, David.

Charles Grey

All right. Any of you have any questions for the for that. Okay.

All right.

If not, there's no one else to speak.

Mayor motion, please. I'll make

Christopher Poole

a motion to approve. Second. As I said before, I think this is a great project in an area that really needs it, so I'm fully in support of it.

Jaimie Girardi

That includes the change of the condition numbers, correct? Yes

Christopher Poole

sir.

Charles Grey

And we have a second. Yes.

Connected City

I was gonna say if for what it's worth we we do consider the environment in a lot of these projects and there's a lot of um you know John can speak he's he's forgotten more than I'll ever know about uh Uh stormwater treatment and and uh its impact on the environment, so forth. So There's there's a lot of uh things that we have to do when we approve the or when these projects get approved that the developer has to do to make sure that The impact on the environment is Negligible. So it's something

we definitely do look at. So your your concerns are not Unheard.

Christopher Poole

I'm I'm actually an environmental geologist and I'll be happy to if you stay after the meeting I'll be happy to to speak with you too separately. Sure. Thank you. You're welcome.

Jon Moody

And I'd just like to say as the project evolves I do hope that they utilize the rail. I think if we want industrial jobs in the country that having access to rail is important and I'm still very pleased with the Location of this project in proximity to the rail. Agreed.

Charles Grey

Okay. No other comments. Um We have a motion, we have a second. All in favor signify by saying aye. Aye. Aye. Opposed, like, sign.