366 in the published record, 1 in the recordings
In the record
Published agenda366 items
Published agendas and the dispositions the approved minutes recorded. Twelve years, whether or not a camera was running.
- Mar 11, 2025Board
N70No disposition in the minutesPublished agenda - Mar 11, 2025Board
N73No disposition in the minutesPublished agenda Extension Letter to RSQ-ML-19-088 – Jones, Edmunds & Associates, Inc. – Professional Stormwater Engineering Services
- Mar 11, 2025Board
N65No disposition in the minutesPublished agenda Extension Letter to RSQ-ML-19-088 – AtkinsRealis USA, Inc. – Professional Stormwater Engineering Services
- Mar 11, 2025Board
N68No disposition in the minutesPublished agenda Extension Letter to RSQ-ML-19-088 – DeLoach Engineering Science, PLLC – Professional Stormwater Engineering Services
- Mar 11, 2025Board
N75No disposition in the minutesPublished agenda Extension Letter to RSQ-ML-19-088 – Singhofen Halff – Professional Stormwater Engineering Services
- Mar 11, 2025Board
N63No disposition in the minutesPublished agenda Extension Letter to RSQ-ML-19-088 – Applied Sciences Consulting, Inc. – Professional Stormwater Engineering Services
- Mar 11, 2025Board
N71No disposition in the minutesPublished agenda Extension Letter to RSQ-ML-19-088 – Geosyntec Consultants, Inc. – Professional Stormwater Engineering Services
- Jan 28, 2025Board
C13ApprovedPublished agenda First One-Year Renewal (FY 2025) and Additional Purchasing Authority (FY 26) of Stormwater Culvert Replacement Contract – Multi-Year – Bid No. IFB- RH-21-066 – Southern Road & Bridge, LLC – $4,000,000.00
Approved minutes
Approved the Consent Agenda
- Jan 14, 2025Board
N79ApprovedPublished agenda Change Order No. 4 for Task Order No. 3 for Professional Services – Stantec Consulting Services, Inc. – Stormwater Program Support Services, Time Extension (PIFBA24-0452)
Approved minutes
Approved as part of the Public Hearing Consent Agenda.
- Oct 22, 2024Board
N119No disposition in the minutesPublished agenda Release of the Right of Way (ROW) Maintenance Guarantee Surety Bond No.107133392 – Society of St. Vincent de Paul South Pinellas, Inc. (Developer) – Ozanam II VillageRight of Way Improvements - Permit No. ROW-2019-00437 - The Project Consists of Constructing a Sidewalk, Access Connection to Site, and Stormwater Piping on Osteen Road, Construct Force Main on Osteen Road and Massachusetts Avenue. (TED24-0215)
P59No disposition in the minutesPublished agenda An Ordinance By The Pasco County Board Of County Commissioners Amending The Pasco County Land Development Code To Address Invasive Vegetation By Amending Section 403.1.B.6, Preliminary Development Plans- Residential (PDP-R), Submittal Requirements, Studies And Other Required Submittals; Section 403.2.B.6, Preliminary Development Plans- Nonresidential/Mixed Use (PDP-Nr/Mu), Submittal Requirements, Studies And Other Required Submittals; Section 403.3.B.6, Preliminary Site Plans (PSP), Submittal Requirements, Studies And Other Required Submittals; Section 403.4.C, Stormwater Management Plan And Report, Submittal Requirements; Section 403.5.B, Construction Plans, Submittal Requirements; Section 403.6.D, Fill, Prohibitions And Requirements; Section 403.7.B.6, Mass Grading, Submittal Requirements, Studies And Other Required Submittals; Section 403.10.C.6, Landscape Plan, Submittal Requirements, Studies And Other Required Submittals; Section 404.1.G, Minor Land Excavation, Prior To Excavation Activity; Section 404.2.K, Land Excavation Operating Permits, Prior To Excavation Activity And On-Going Monitoring; Section 404.3.K, Mining Operating Permits, Prior To Mining Activity; Section 404.4.I, Construction And Demolition Debris Disposal Facilities (CDDDF) Operating Permit, Approval Form, Permit Time Limits, And Activities Required Prior To Commencement; Section 404.5.G, Land Spreading Operating Permits, Operational Standards; Section 404.6.K, Yard Trash Processing Facilities, Operational Standards; Section 406.5.H.2 Right-Of-Way Use Permit, Activity Pursuant To Permit, Restoration And Maintenance Standards; Section 406.8.D.2.C, Garden Plan Permits, Application Requirements, General Information, Garden Management; Section 530.23.G, Community Gardens, Market Gardens And Community Farms, Community Gardens On Public Land; Section 604.4.C.1, Scenic Roadway Corridor Preservation And Enhancement, Corridor Buffer; Section 804.8.B, Ecological Corridors, Permitted Uses With Specific County Approval; Section 901.2.F, Transportation - Corridor Management, Interim Uses; Section 901.3.R, Access Management, Maintenance; Section 901.4.E, Substandard Roadway Analysis And Mitigation, Submittal Information; Section 901.6.D, Street Design And Dedication Requirements, Design And Construction; Section 901.6.E, Street Design And Dedication Requirements, Roadside Design; Section 901.7.D, Bicycle Facilities, Construction; Section 901.8, Pedestrian Facilities; Appendix A Definitions; And Other Sections, As Necessary, For Internal Consistency; Providing For Applicability; Repealer; Providing For Severability; Inclusion Into The Land Development Code, And An Effective Date.
PC3No disposition in the minutesPublished agenda An Ordinance By The Pasco County Board Of County Commissioners Amending The Pasco County Land Development Code To Address Invasive Vegetation By Amending Section 403.1.B.6, Preliminary Development Plans- Residential (PDP-R), Submittal Requirements, Studies And Other Required Submittals; Section 403.2.B.6, Preliminary Development Plans- Nonresidential/Mixed Use (PDP-Nr/Mu), Submittal Requirements, Studies And Other Required Submittals; Section 403.3.B.6, Preliminary Site Plans (PSP), Submittal Requirements, Studies And Other Required Submittals; Section 403.4.C, Stormwater Management Plan And Report, Submittal Requirements; Section 403.5.B, Construction Plans, Submittal Requirements; Section 403.6.D, Fill, Prohibitions And Requirements; Section 403.7.B.6, Mass Grading, Submittal Requirements, Studies And Other Required Submittals; Section 403.10.C.6, Landscape Plan, Submittal Requirements, Studies And Other Required Submittals; Section 404.1.G, Minor Land Excavation, Prior To Excavation Activity; Section 404.2.K, Land Excavation Operating Permits, Prior To Excavation Activity And On-Going Monitoring; Section 404.3.K, Mining Operating Permits, Prior To Mining Activity; Section 404.4.I, Construction And Demolition Debris Disposal Facilities (CDDDF) Operating Permit, Approval Form, Permit Time Limits, And Activities Required Prior To Commencement; Section 404.5.G, Land Spreading Operating Permits, Operational Standards; Section 404.6.K, Yard Trash Processing Facilities, Operational Standards; Section 406.5.H.2 Right-Of-Way Use Permit, Activity Pursuant To Permit, Restoration And Maintenance Standards; Section 406.8.D.2.C, Garden Plan Permits, Application Requirements, General Information, Garden Management; Section 530.23.G, Community Gardens, Market Gardens And Community Farms, Community Gardens On Public Land; Section 604.4.C.1, Scenic Roadway Corridor Preservation And Enhancement, Corridor Buffer; Section 804.8.B, Ecological Corridors, Permitted Uses With Specific County Approval; Section 901.2.F, Transportation - Corridor Management, Interim Uses; Section 901.3.R, Access Management, Maintenance; Section 901.4.E, Substandard Roadway Analysis And Mitigation, Submittal Information; Section 901.6.D, Street Design And Dedication Requirements, Design And Construction; Section 901.6.E, Street Design And Dedication Requirements, Roadside Design; Page 3 of 7 Section 901.7.D, Bicycle Facilities, Construction; Section 901.8, Pedestrian Facilities; Appendix A Definitions; And Other Sections, As Necessary, For Internal Consistency; Providing For Applicability; Repealer; Providing For Severability; Inclusion Into The Land Development Code, And An Effective Date. File Number DRD24--0036
In the room
Transcript1 moment
Machine transcription of 283 recorded meetings — 9% of decided items have one. Speaker names are inferred from voice and can be wrong.
- PC12 PDD 24-7744 Hani auto repair C2 rezoning
Connected City Um M Mr Moody, is there a um you're you're the stormwater expert, so is there um special containment So is there a special can um containment process that um in a situation like this where they would have to do things to mitigate the stormwater. Photoshop