PDE-25-7824
Published agenda3 appearances between Oct 3, 2024 and Nov 12, 2024, at 2 boards.
Approved the item per Staff’s recommendation.
Official title
Zoning Amendment (Continuance) – Sandarben LLC – Change in Zoning from a A-C Agricultural District to a AR-5 Agricultural-Residential District – North Central Pasco County – Northwest Corner of Bellamy Bros Boulevard and Johnston Road – Containing Approximately 92.60 Acres
On a calendar
Oct 3, 2024 → Nov 12, 2024 · click a mark to jump to that appearance
Every appearance3 of 3 are in a recording
Each appearance carries the official title above. Where the county’s wording changed, the change is marked: added and removed. Steps with no marks were worded identically.
TranscriptWhat was said at each appearance is below it. Machine transcription, with speaker names inferred from voice matching. 81% of 251 lines carry a name. It shows what was said, not what was decided, and both the words and the names can be wrong.
- 13mDenise
Good afternoon, Mr. Chairman Planning Commission Members. Denise Hernandez, Planning, Development and Economic Growth Department. We're going to start at item PC one, which is PDE 257824. This is a zoning amendment, Sandarbon, LLC. The request is to continue the item to the October 17th, 2024 Planning Commission meeting at 130 in Newport Ritchie.
GreyChairOkay. Okay, is the applicant present? Anyone here to object? Okay.
DeniseMoving on to item PC2, that's PDE 257738, Zoning Amendment, Evans County Line 80 MPUD Master Plan Unit Development. On that item, there are several ex parties for the record, and we will be put sending those to the clerk's office. We have an ex-party from Chris Poole, one from Chris Williams, one from Commissioner Katherine Starkey, and one from from John Moody. If there's any others, because it looks like they're sending separate emails, please let us know. We'll
just forward them out over to us. On that item, the request is to continue the item to the November 7th, 2024 Planning Commission meeting at 130 in Dade City.
GreyChairOkay, and the applicant present. Anyone here to object? Okay.
DeniseFollowing item is PC three PDE 250018. This is a comprehensive plan amendment, CPA 24, 05, Rural Area 4, and Urban Expansion Area Maps to adjust boundaries. The request is to continue the item to the uh December 12th, 2024. Planning Planning Commission meeting and this one you're actually sitting as a local planning agency. I should have stated that. At one thirty PM in Dane City.
GreyChairOkay. Is the applicant present? Anyone here to object?
Okay.
DeniseAnd that's the end of your continuances. I'm actually going to move on to the addendum agenda, which is A PC six.
GreyChairI have
Moodya motion. Approved continuances. Move to continue items PC one to the October seventeenth meeting in Newport Ritchie, item PC two to the November seventh meeting in Dade City, and item PC three to the December twelfth meeting in Dade City. Second.
GreyChairOkay, we have a motion and a second, further discussion. All in favor signify by saying aye. Aye. Opposed, like signed? Okay.
- 2
Zoning Amendment
(Continuance)(Consent) – Sandarben LLC – … in Zoning from aA-CA- C Agricultural District to a … Containing Approximately 92.60 AcresApproved minutes
Approved the item per Staff’s recommendation with edits on item 3 regarding the sentences after “Bellamy Bros Boulevard a County-maintained arterial road with approximately 50 feet of right-of-way” would be removed and on item 14 that everything after “SSRRA-2024-00183” would be stricken in the Agenda Memo as stated by Ms.
13mDeniseOkay, I think that puts us at APC thirteen.
Chris WilliamsOh. Do you
Unidentified speakerVoice Awanna hear a full presentation, Chris? Or you just have a question?
Chris WilliamsI just I just had a comment. I know this was came through as a comp plan. I voted against it then. I wasn't comfortable. I'm still not comfortable, but That's okay. I just wanted to mention that.
MoodyOkay. I remember the case too, and there was some discussion over whether this would be five acre lots or ten acre lots and They're five acre lots. Yeah, they're planting five acre
Deniselots.
MoodyAnd were you was it your
position that they more ought to be ten acre lots or
Chris WilliamsI mean there's nothing five acres right around there.
And so I'm I'm just not comfortable plunking five acre lots. In the middle of everything else that's out there. Everything else is Ten, twenty.
Understood.
Unidentified speakerVoice AOkay.
DeniseAnd as um as Mr. Williams correctly stated, it did come in for a compliant amendment, and the Board of County Commissioners did approve that compliant amendment on June 4th. um from AG, which is 10 acre lots, to AGR. Um and that's so this is the accompanying zoning for the property. Not sure if you want to hear from the applicant. Uh but what is being proposed is uh eighteen five acre lots on the
Chris Williamsproperty. I did have one question and mentioned being the rural transition or something like that. The rural transition
Denisearea.
Chris WilliamsOkay.
DeniseYeah.
Chris WilliamsAnd what's the long term plan for that?
DeniseUm, does someone from Planning Services wanna talk about the long-term plan for the rural transition area?
Unidentified speakerVoice BVictoria Speethos, Planning Development Economic Remove. Uh the rural transition area is to It is what it the title says. It transitions from the suburban nature of the county that exists to the west and south. uh into the northeast rural part of the county. So the without a map, I'll generally describe it. Uh the rural transition area comes almost to US 41 on the West End. It doesn't quite hit 41. Um, and then it comes to the south along State Road 52.
Uh and then it goes east all the way to Balbellamy Brothers. And maybe it jogs a little bit as it borders that right-of-way. Uh but all of that is to be transitional land use. In other words There are some development types that can enter into the transition area to be close to suburban densities. We've traditionally Uh read that and understood that to be and density is anywhere between one and two. or so dwell units
per gross acre. Because the suburban density would be res three and the highest or most dense rural density would be res one, according to the comp plan today. So The balance is between one and three at that point. So the rural transition area is intended to have this sort of up to two dwelling unit or so density per acre.
Connected CityOn that border between the rural and the rural transition. It's closer to that border as opposed to the Bell
Unidentified speakerVoice Aisn't Bellamy Brothers the the divide.
Unidentified speakerVoice BYeah, there's a divide there between rural transition area ones. This is the w yeah. So this would not be the this was not the first property or location within the rural transition area that had The um Was it the AGR classification? Yeah, the AGR classification, rule future land use classification applied to it. There are other areas within the Rural Transition Area that have both AG and AGR. Um And they and they are compatible with the rural transition area.
Unidentified speakerVoice AThank you, Terry.
Cindy, do do you wanna
Cindy TerrapaniI'm the applicant. May I say a few words? Correct. Good afternoon, Cindy Terrapani. Uh Terrapani Planning Strategies. I'm located at 128 East Tarpon Avenue in Tarpon Springs, Florida. I am the authorized representative for Sandra Benn, who is the property owner of this site. And you all are all correct. Um the plan amendment did go through this board. I believe we were here in March, and then it went to the Board of County Commissioners. Commissioner Oakley for final approval in June of this year. And some of these same uh issues were discussed both at your hearing
and at the board hearing. And what they what the board determined um was that uh as uh Mr. Pito stated that AGR and AG, the five-acre lot and the ten acre lot uh D districts or plant categories were both appropriate in the rural transition area. We believe they are too. The plan amendment was approved for five-acre lots. This is a 92-acre site that has very little wetlands, about six uh six-tenths of an acre in two different pieces, so really not any uh major environmental
issues. And 92 acres and five-acre lots, if approved. We've resulted in a maximum of 18 lots. Um, but we we intend to go through the rural minor rural subdivision process and that limits it to 16 lots. So that's the absolute maximum that we we could by comp plan do 18. We don't intend to do that. We intend to do a maximum of 16 lots, and there are two houses on the property today. So it's really only a net increase of fourteen lots um and we could have done nine under the old under the old plan category. So we think it's
a reasonable uh request. With regard to the various lot sizes in that rural transition area, there are a wide variety, maybe not immediately adjacent, but there is a pretty wide variety of lot sizes. I think the most important thing that we'll tell you that there was that the rural area folks didn't have a problem with is there were people there at the board hearing. I think some of them might have come to your hearing. I won't swear to that, but for sure at the board hearing there were people from From the northeast rural area, there, some of the activists that are come to all the hearings, and
they did not object to this case. So I think that um tells you something about it. We also did a wildlife study. We think that there may be gopher tortoises there, but no other listed species, so it's not a major environmental site. Um I think I'll just stop there and see if I can answer any more of your questions. We do appreciate your time today.
GirardiVice ChairJust one question, which is Since we just heard a case where the applicant apparently didn't read all the findings. Um
Just wanna make sure that you're aware that finding fourteen requires you to improve Johnston Road to a County standards and your clients willing to do that?
Cindy TerrapaniUm we're not intending to take access on Johnson Road. We're we already have an access that was uh approved by the county um to Bellamy Brothers with an and it site ha has been approved with that access uh driveway and a driveway that goes all the way through the property that's already been approved for the site.
GirardiVice ChairWell if that's the case then Okay, I'm just reading the findings and this Denise Finding three says their access is also the Johnston Road. So
Cindy TerrapaniYeah, I think there might be some misunderstanding. East of Bellamy Brothers, Johnston Road is a real road. West of Bellamy Brothers, which is where this site is, on the west side of Bellamy, Johnson is a is there is no right of way for Johnson Road. So we will not we don't touch Johnson Road. where our site is located because Johnson Road only exists with right of way east of Bellamy, which we don't touch that. So I think there might have been a misunderstanding. I I didn't to tell you you the truth, with all the craziness of these storms, I didn't catch that either, Mr. Goldstein. But um I I don't I think we
need to straighten that out.
GirardiVice ChairSorry.
So um Denise, if that's accurate, and I have no idea if it is, then Obviously finding three and finding Fourteen.
Would need to be changed because finding three says they're accessing Johnston Road. Yeah. And fight finding fourteen says they need to improve. Johnston Road to County Standards. So
DeniseI don't know if any of our transportation planners want to speak to that, but that is accurate. If they're not gonna be accessing Johnson Road, but we should probably have something stating. That They're not gonna be accessing Johnston Road because Johnston Road is being shown through that property.
Connected CityI mean if it doesn't have right of way, that makes sense.
GirardiVice ChairWell I I don't even know how this language I I I'm assuming Liam deferred to our transportation folks when he came up with this
Moodylanguage.
GirardiVice ChairSo
MoodyAnd is there any need for like a secondary or emergency access? Yeah.
Cindy TerrapaniIt's only at most it'd be eighteen lots if we totally maxed out at five units at five acre lots, but we intend to do most sixteen lots. So I don't believe you it triggers a second the need for a second. It does not trigger secondary.
Connected CityOkay. What about interconnect requirements um for those lot sizes I assume not? Right.
GirardiVice ChairWell if it's an actual road maybe, but uh what I'm hearing the applicant says it's not an actual road.
Cindy TerrapaniEast of Bellamy it is, west of Bellamy it is it is really not. I think I ha I'll I need to double check this, but I believe there might be an easement only across Johnson west of Bellamy to other properties, but I'm ninety nine percent sure there's no right.
And regardless, we don't intend to access it anyway, so
DeniseAgain, we should have transportation staff that can speak to that because it is showing on mapper that that is a road. west of Thelamine.
Connected CityIt doesn't mean that's accurate, but it's showing it, right?
Unidentified speakerVoice ACorrect.
Right. Somebody online, Essen or Stacy, somebody wanna speak to that?
MoodyYeah, but When we do substandard road, go ahead.
Unidentified speakerVoice AGo ahead, Stacey.
Stacey BurgessYes. Oh, so I'm looking at Pasco Mapper and I'm also looking at the seller records up. And the transportation planner that reviewed this listed it as exempt. So looking at that is telling me that the access will be from Bellamy Brothers Boulevard. Johnson Road is showing up as a private. And typically when we're reviewing these, we tend to um access our collectors or tiers or local roadways.
Cindy TerrapaniThank you. Yeah, I should have mentioned that we do have an exemption both to timing and phasing and to substantive road analysis approved by the county.
GirardiVice ChairYeah, well that's why it's confusing because findings fourteen says that it's not exempt.
Cindy TerrapaniAnd again, I I only got power back recently just like everybody else. So I I have to say I I missed it too. I I apologize.
Connected CityWe'll sort of let you off the hook, maybe.
DeniseSo we will look into finding 14. Um And uh but this was based on the information we received from our transportation staff.
Cindy TerrapaniOkay. Okay.
Any other questions I can answer for?
Connected CitySo so if
GirardiVice Chairwe approve, do we approve as is with that I mean you could approve it with the Modification defining three and fourteen. If that's your desire. I From what our the transportation person said on WebEx, uh it sounds like it was supposed to be exempt. Not sure how they said it's exempt or then targeted memo says it's not exempt, but It is what it is.
Unidentified speakerVoice ACan't can't you just remove the Ann Johnston Road portion from finding a factory?
GirardiVice ChairWell you also have to move rem remove
Unidentified speakerVoice Athe second part of one at a time. You take three and just strike through the end.
GirardiVice ChairYes.
Unidentified speakerVoice AAnd then fourteen.
GirardiVice ChairYou could strike everything after the first
Sentence. And fourteen.
DeniseYeah, so on item three, just for the record, it would after it states uh Bellamy Brothers Boulevard County maintained arterial road with approximately 50 feet of right-of-way, it would end there. So period, the rest of it would be removed. And then on item 14, it would um end at when the parents says SSRA or R R A 2024 00183, period, the remain the remainder. Would be stricken.
Unidentified speakerVoice AYes.
Connected CityOkay. I would um move approval of that with the edits that Ms. Hernandez just mentioned.
Unidentified speakerVoice AI will second. Okay, motion and a second. Any other discussion? All in favor? Aye. Aye. Aye. Opposed? Night. Thank you very much.
Thank you.
- 3
Zoning Amendment
(Continuance)(Regular) – Sandarben LLC – … in Zoning from aA-CA- C Agricultural District to a … Containing Approximately 92.60 AcresApproved minutes
Approved the item per Staff’s recommendation.
27mMadam ClerkPerfect publication, Tampa Bay Times, September eighteenth, 2024, and by affidavit of certified mailings and site postings.
Liam DevineLieume Divine, Planning, Development, and Economic Growth Department. Um P79, just some housekeeping. Um staff has received two ex parte communications for this item from Commissioner Oakley and Commissioner Weightman. Those have been sent to the clerk's office. Um this item was inadvertently um put on the agenda as a regular item. I don't believe we have anybody signed up for public comment. Um So if you would like a presentation, I can certainly go through a presentation. This is PDE 25-7824
in the name of Sambardine LLC. Would the board like a presentation?
WeightmanChair. Yeah. I don't have a I'm good with this project, Liam. I am confused you know, I'm a
I I really like to see these minor real subdivisions. um happening. I think they're a great product and value add to Pasco County. And it adds a real quality of life for folks and to have a little piece of property and and and do what they want on it. But I am concerned that within the minor and I learned through this project that I am concerned that through this the the minor rural rules, you know, we we c kind of struggle as a county on how do we do these. But they're capped
at 16 homes on a minor rural subdivision from what I'm told. And I don't know how in the world you You have a hundred acres or two hundred acres and you you can only get sixteen lots out of it. I I don't understand the history if it's arbitrary, I don't know if Karbala's looked into it even further, but as we just hopefully we see more of the right minor rural subdivision projects that that come through that we don't accidentally hurt ourselves in in bringing forth a good good housing product
by some capping sixteen five acre lots or whatever it might be throughout the course of that project. So that's all
OakleyChairI think Dave would have something to add.
David EngelUh David Engel, Planning and Economic Development Director. I uh did a little bit of investigation on the 16 lot restriction, you know, cap. And we couldn't find any clear record, but from what I understand it was based on the road improvements. If you had thirty or forty homes, then you have to upgrade to a county standard road cross section. So uh we'll take a look at this and we'll put it on the uh Priority list if you'd like and we'll get back to you.
WeightmanThat would be good because that's part of the the hurdles that when a minor rural comes, these trigger points, right? Like this example that you just cited. We really need to get out of our own way and make, you know, allow these minor rural subdivisions to come to fruition and that way folks aren't discouraged. with bringing that type of product forward. I I think that's what this board we want to see more of throughout the entire county if it's possible. And uh we just kind of work together to get out of our own way sometimes. Thank you. Thank you.
MarianoMr. Chairman Mariano. Yes sir. And to add on to add on to that, earlier we heard a presentation that added added property in the uh uh protection zone. All the s all the the long process you had to go through the whole thing. And if I think if you've got a large piece of property, maybe it's five acres, maybe it's less, maybe it's ten. But if someone wants to have a family member one or two add on to it, I think we need to make it easier to do.
OakleyChairUh-huh. Yeah. Well these this is a good rural uh product right here. So the area I live in I don't remember exactly how many total acres it is but there's only about I think there's only about twelve houses but we're all f I think there's one that's actually bought two lots which are on ten but the rest of 'em are all five acre tracks. Makes a very nice rural area to to live in. Yeah. All right, a pleasure
of the board. Uh
StarkeyVice ChairI do have a question.
Okay, question.
Um is there a plan for multi-use or anything going up Bellamy? Because I know there is further south, so what what is the plan for Bellamy?
OakleyChairIt's uh this so I don't know.
StarkeyVice ChairYeah, but the the the Orange Belt Trail is having to deviate from the rail corridor, so I'm just not sure where it's going all around here and people are gonna wanna be able to get there. So just what what's going on here.
You said that.
Sun CoastGood afternoon Commissioner. It's Nick Urent, County Engineer. We're talking about Bellamy Brothers north of 52.
StarkeyVice ChairYeah, I know Clark's project and uh Bellamy in fifty two is putting their trail in to get under the seventy five. Right? Right.
Sun CoastThat's easy.
StarkeyVice ChairRight,
Sun CoastAnd then we and then a lot of the Vision Road network connecting east to west has not it's all future, it's has not been constructed. But the projects the residential projects along Bellamy Brothers are constructing their portion or dedicating right away to us for construction of their portion of the Vision Roads network that's gonna go east to west. If you're talking about sidewalks on the on Bellamy Brothers Road itself the developers are obligated to construct sidewalks along their frontage. Right. And then we, as part of the, as part of the safety project that we're doing to widen
out the corridor with the paved shoulders and the edge treatments, we'll be installing connected, uh filling the gaps for the sidewalks all the way down to 52. Uh and and we did that because our land development code did not give us the authority to obligate those developers to build sidewalks outside of their frontage. So we're going to be coming along and making sure that there are connected pedestrian facilities to the State Road 52 corridor for all the residential communities that are happening on both east and west sides of the road.
StarkeyVice ChairOkay, so uh so there they are reserving right-of-way along the front of Bellum.
Sun CoastYes, they they're conveying right-of-way consistent with uh our ultimate Vision Road network and the right-of-way footprint in our comp plan.
OakleyChairAnd there'll be some improvements on on Bellamy coming uh widening on both sides of Bellamy to strengthen the shoulders and widen the Bellamy Road to make it safer too. So that's that's coming in twenty seven, I think.
Sun CoastYes. Yeah. We are actively negotiating the design contract. The board already approved our short list and we're in negotiations with our number one cons consultant to get that design contract underway.
StarkeyVice ChairThat was my only concern that there was gonna be some way that Someone could get out of their subdivision and head somewhere safely, not in a car.
Sun CoastIndeed, I share your concern and we are taking steps to ensure that that possibility will come to fruition.
StarkeyVice ChairIt can be a horse I should be able to tell you. But something other than a car.
That one.
Liam DevineI would ask before you make a motion if you can at least accept public comment. Because this was a regular item. Okay.
OakleyChairHas anyone anyone signed up for public comment? No one
Madam Clerksigned
OakleyChairup. No one signed up. Anyone in the audience wish to speak to this item?
YeagerYeah, I
Unidentified speakerVoice Cdidn't sign up but
OakleyChairOh you can you can come speak?
Doesn't matter that you signed up or not, you still were allowed chance to speak. Give us your name,
Unidentified speakerVoice Caddress, and if you've been sworn. Daniel Radderman, [address removed]. Yes, I have been sworn. Okay. Thank you. Uh I appreciate the time. I uh own the fifty acres uh just east of the subject property. Um it's a dedicated wetlands, low-lying area, and all of the water from not just the subject property but the surrounding area
west of Bellamy comes flooding into this area when it's when it's um when it's raining. If you've driven through this area recently, you know that are that part of the property, probably about 10 acres, is still flooded. They just removed the last of a stranded vehicle from Milton last week. So it is an area that's known for flooding, as I'm sure you all are aware. Bellamy Brothers was shut down for you know a handful of days post. Um
I was sent something in the mail, I think many of us were, about a proposed site plan uh of the 16 houses. But you'll notice that the they're selling lots right up to Bellamy Brothers uh on the area across from my property. It seems to me that um considering the the grade issue, the westernmost part. Of the subject property is probably on a 2% grade. And if you you start capping that with hard surfaces, houses,
pool decks, driveways, sidewalks, you're not only increasing the velocity of water into that dedicated wetlands area, but also the volume of water. So it seems to me that the way that they propose this, there's no you know water containment uh project. Provisions for this, and there needs to be, because we already know this is an area that's subject to flooding. Um I think just um anecdotally, I think there's an Austin Woods development that's just south of St.
Joe's on Bellamy. I think they did a great job in how they set that development back off of Bellamy. They created burns. Um, you know, for partially for privacy but partially for grade considerations. They have the uh stormwater waste palms beh uh ponds behind those berms. They did a wooden picket fence and I think if um we could propose something like that I think, you know, from a practical standpoint it's
needed, but also from an aesthetic standpoint, I think it'd be greatly appreciated. Thank you.
OakleyChairThank you.
Cindy TerrapaniGood afternoon, Mr. Chairman and Members. My name is Cindy Terrapani. I'm the authorized agent for this application. I didn't sign up to speak because I didn't know if there would be any concerns or comments. So I'll just take a few minutes if you don't mind. First of all, Yes, sir, I have been sworn. Thank you, Mr. Chairman Mariano. Um first of all with regard to the rightway, yes it is. We are well aware the Bellamy Brothers is a vision road. We've already um accommodated the new rightway, the additional rightway on the project as we are you know starting to move through more detailed design, although
we're not far into that at this point because we're waiting your hopefully your approval of this. The site plan that is was referenced, um can we turn On the Elmo possible.
Unidentified speakerVoice DBirdie.
Cindy TerrapaniSo just to orient you, on the right side of the screen, that's Bellamy Brothers, that's the roads frontage, and the site is about 92 acres total. We have drawn the site plan to reflect what 16 lots would look like because as uh Commissioner Weightman mentioned, um 16 lots is the maximum number of lots you can do through the minor rural subdivision. As you'll note there's only two lots that front on Bellamy Brothers. We did that specifically so that it would, you know, as people are driving by it would retain the feel of a rural area.
And their road that serves the project goes right through the middle of the site. Generally, that access road has already been designed and approved by the county and we constructed it at this point. Um my client is well aware that he need still needs to go through the minor rural subdivision process and do all the requirements that the county and Swift Mud would require, which would include of course any um stormwater management process uh or design that would be needed. Um Mr. Rotterman that lives directly
across the street, he is correct, the front of his property is a wetland and that wetland is pre- existing, it's there today, it's on his property, it is not on this site. But again, we're well aware we have to go through the rezoning process, the site plan process, and the meet all the construction standards of the county. And I would just remind you also in June of this year, this board uh unanimously approved the plan amendment that went from a 10-acre plan category to a five-acre plan category. This rezoning is now matching that exists exactly. We're going from a 10-acre
zoning district to a five-acre zoning district. what we're requesting. There are two existing homes. on the property today, so it's only 14 new lots. We could have done eight under the old plan category. So you see it's a very de minimis um improvement and we're will certainly follow all this the all the county's requirements for construction as we move forward if you should grant this. Be happy to answer any questions.
MarianoMs. Jim. Yes, sir. How long Going east to west are those back lots. One seven do eleven.
Cindy TerrapaniUm the back lots, you know I didn't bring the one that has all the dimensions on it. There've gotta be I'm guessing they're probably six hundred feet at least east to west. You're talking about the runs that are ones that are running uh on the very back edge of the property. Yes, sir. I'm guessing six, seven hundred feet just from the proportions of the other lots.
MarianoSo hearing about the stormwater issues along the side, um and I'm not familiar with the t top topographical aspects of the property, but What would it be if you would be able to take and maybe add ten or twenty feet going off those lots to now they're five ninety or five eighty, move it back a little bit, make them a little bit shorter, and then create more storage up to the front where you could even landscape it better.
Cindy TerrapaniWell I I think that that's a good idea and I'm certainly not an engineer. I don't don't know all the details of the topography of the site, so I would defer that to when we go through the c the process with the county and let the applicant's engineer work that out with the county as the best way to do that. That that may be the best solution. Um but I think it's appropriate for us to do that through the site planning review process.
MarianoRight, but the site was not going to come back to us, but I do want to make sure that it gets looked
Unidentified speakerVoice EThese are five acre lots though, Commissioner. So you're gonna ha you're not gonna have stormwater ponds required in the in a minor rural subdivision. It it
OakleyChairThese these are good size lines
Unidentified speakerVoice Ehere.
Cindy TerrapaniThere are s there is a sway along each side of the entrance road driveway. Um running pretty much the whole length of that. And as again That that driveway that starts at Bellamy and runs through the property was designed and then approved by the county and actually constructed. So um if we need to Does that driveway have a culvert underneath it? I don't know the answer to that. I'm not an
StarkeyVice Chairengineer I'm not
Cindy Terrapanian engineer,
StarkeyVice ChairI'm sorry, Commissioner Yeah. Do we need I don't know do we require coverts like um something like this?
Unidentified speakerVoice EMm. I don't necessarily know. I don't know. They can impede normal the normal the historic flow. And so if that would require a culvert, they would have had to have installed one. Yeah. Um But if there's no swale system there I w they wouldn't need focus.
OakleyChairYeah, If that's already been through the regulations on on that being approved by the county, that road they was told 'em then it had to have a covered or not, so
Cindy TerrapaniYes, sir. I believe so. I'm sorry, I can't answer that question.
MarianoMr. Chairman Mariano. Can staff pull up on map pages to see if there's any existing flooding there? Do right now.
Yeah, Pasco Mapper, map pages, whatever.
Mike CarballaYeah,
OakleyChairwe can pull up Haskell Mapper. Yeah, this hadn't been flooded, I don't think. Pretty flip.
Rick ScottCan you bring that up?
OakleyChairThat's not it.
MarianoWell I you just had it down below up.
Actually that's that's
OakleyChairwetlinaries that where it says A?
MarianoYeah.
Mike CarballaYeah,
OakleyChairthat
Mike Carballatracks
OakleyChairwith reserve flooding
Mike Carballaduring the storm system.
MarianoOh that's what's fine. Pretty close what the gentleman says. Yeah. So now if you take the extra runoff from the roadway going all the way down. If it flows that way.
OakleyChairWell I can tell you that on the road there that's that's flowed like that for many, many years. Yeah. Always been there. Yeah. This doesn't necessarily change that.
MarianoDoes the water ever get toppled over? Does the roadway?
OakleyChairOh it's uh I think it's sometimes but it recedes fairly quickly, I think.
YeagerIf we add more to that, we'll s I said I'm just concerned if we add more to that, will it recede quickly?
OakleyChairNorth of it.
YeagerNo, I said if if we add more.
Well, why
StarkeyVice Chairwould we be why would they be anything more?
OakleyChairIt's on the outside of the land, but it's
StarkeyVice Chairnot
OakleyChairthat's you've had one of the you've had a two hundred year storm and it's it's basically where where they're showing, so
MarianoSo that shows on both sides of the road.
Mike CarballaYeah, that was from the El Nino of O three. We do actually have some aerials that we shot after the storm. I don't know if we can add it as layers in place. Can
Marianoyou throw the topist to topo out? Twenty twenty
StarkeyVice Chairfour is gonna be interesting when we
Marianolook at those.
OakleyChair2024 and stuff
StarkeyVice ChairWell if they could get another ten feet across the front there that would be helpful. Shown on that map.
Make the swell bigger.
But I'm no engineer.
OakleyChairJust give us a second.
Very good.
Unidentified speakerVoice EMr. Chairman Mariano. Yeah.
You have as the as the applicant has pointed out to you, you've changed the comprehensive plan that this is the o this is really the only appropriate zoning classification that Can go here.
So if Uh
StarkeyVice ChairI think the question j just is if we put Yeah,
Unidentified speakerVoice EOkay. So th th this is Euclidean zoning, so you can't condition it. Um you can express your concerns to the applicant. Um
Unidentified speakerVoice CI have the I have a quick follow-up question. Did I understand that there does not
OakleyChairHave you already spoken?
Unidentified speakerVoice EYes. These are that that was your only speaker.
OakleyChairI just
Unidentified speakerVoice Cwanted
OakleyChairto
wanted clarification. I've got to give you a name and all again because you've left and then come back. So give me your name again.
Unidentified speakerVoice CDaniel Radderman, [address removed]. I have been sworn in. Okay, did I understand it correctly that there does not need to be any stormwater engineering considerations with a development of this size then with the density I guess? High cultural zone.
Cindy TerrapaniNo, that's not.
Unidentified speakerVoice CYou don't require that in agriculture as a right?
Unidentified speakerVoice EI you need to have somebody from your stormwater department answer the question. Yeah,
Unidentified speakerVoice Cthat's what was confusing to me. I just I didn't know if I misunderstood that or
Unidentified speakerVoice Emy comment was that that a five these were five acre lots, so they traditionally would not require Any addition Based on our code, they wouldn't require any additional stormwater pond ponds. They're designed to absorb
Yeah. Our large lot development doesn't require the that addition the the same sort of stormwater ponding, but the planning staff should be answering these questions.
Unidentified speakerVoice COkay, yeah. Because if not we've got a big we've got a big problem then with the stormwater. I got a five acre track. I don't
Unidentified speakerVoice Fhave to put stormwater on mine. Okay, Brad. I was gonna let this play out and see where it went. That was interesting. Uh Brad Tippen, uh playing Development Economic Growth. Um uh Yes, you're you're correct that this is a you know these five-acre lots typically are considered de minimis in these subdivisions that are minor rural subdivisions. There are some stormwater considerations that are taken into effect, mainly regarding the amount of impervious that is installed, uh can trigger some of the swift bud requirements. Um so we have to
we have to take all those different things into account. But at this particular phase, we do not have a plan in front. front of us. We we don't have any way to look at anything to say that this is going to require something or not require something. Uh this is a straight rezoning as uh uh the county attorney said that there's no way to condition it to require extra things at this point.
OakleyChairOkay.
MarianoSo thank you, Mr. Chairman. Yes sir. So look at look at the topo. From the back part of the lot is as high as 130, goes down to 125, 120, 115, 110, 105, 100. That roadway going all the way in? It's going straight in. Everything that gets run off on that roadway all the way down is gonna go back to that down to that low spot. It's gonna be it's gonna make it worse. On that land it always has. I I know, but now we're gonna make it worse by putting worse all the way down.
StarkeyVice ChairThey're not
Marianois that a paved road.
OakleyChairHe's not changed. That's been a paved road. That's a paved road. Nice. We're not making it worse, we're just changing the
Marianosize of the watch here.
Unidentified speakerVoice GRight.
MarianoAnd again, I'm happy with what what I see, but it is a concern when I see the flooding right along the roadway.
OakleyChairWell I understand but that's on everybody's minds about flooding and these kind of properties are not creating that. I mean the world receives rain and the type of rural areas, water moves, the low areas off hills and where they are you have ponding on different properties all over the county based on the fact that you have hills and we're we're in a country where we have a lot of rolling hills. Not a lot of people come to Florida think that it's flat, but it's not
it's not flat. Well not a real
MarianoMy concern is this, we're building a road we have a roadway, road that's there. It's already there. And I'm I'm thinking, you know, when I when I look at places like at Oak Ridge down by Trinity, that area's after all the flooding going to Trinity Oaks, but because of the channeling that they have Oak Bridge doesn't flood. Never see them in the map because they've got the channeling in there. So Mr. County Attorney, is there a way we can ask, even though it's Euclidean zoning, for staff to work with the applicant to try to put in some type of channeling
there to to control some of that water? You can
Unidentified speakerVoice Ealways ask. Okay. I don't know whether you can require, but you can always ask.
We need uh
OakleyChairwe need so.
YeagerI need I support your asking.
OakleyChairOkay. Pleasure
Marianoof the board on this item. So we have an ask.
StarkeyVice ChairI'll uh move for approval.
MarianoUm could I get my ask in first, please?
StarkeyVice ChairOh, sorry. he asked for something.
Marianowhole second. The five acre sites, right? But I'm concerned, and I think your people might be as well, if we can prevent as much water going the roadway on big storm events to go in there. Would you be willing to work with us to try to create some type of channelization or some type of holding of the water to store a little bit more on the line the edge?
Cindy TerrapaniWell, my client unfortunately is not here, so I can't make a commitment one way or another. What I can say, knowing knowing him, knowing the property owner, is that We will go through the county process for the minor rural subdivision, and is there something that we can do on that deals with the water on our site, we will certainly consider that. We cannot fix the problem that exists today. There is a lot of water that goes into Mr. Roderman's property that goes into his wetlands today. It has absolutely nothing to do with my client's property, or frankly, it's just a historic situation. So we can't
fix that. So If you're asking us to fix the whole world's problem with Mr. Roderman, no, I don't think we can do that. But if we can look at something that that is a simple solution that would help with the water on our site, we would look at that.
OakleyChairI'd appreciate that.
Cindy TerrapaniThat's understood. Thank you so much or
OakleyChairto have a motion and a second. All those in favor say aye. Aye. Aye. Aye. Motion passed by zero. Move back to uh regular items.
Environment.
Five room.