An Ordinance By The Pasco County Board Of County Commissioners Amending The Pasco County Land Development Code; Section 902 Stormwater; Subsection 902.2.K, To Eliminate The Requirement To Submit As-Built Surveys, Except In Flood Hazard Areas; And Other Amendments, As Necessary, For Internal Consistency; Providing For Applicability; Repealer; Providing For Severability; Inclusion Into The Land Development Code, And An Effective Date.
What the county recorded
Staff recommendation
No Action Required
DispositionNo action
No action was required as this was the first Public Hearing. The second Public Hearing is scheduled for July 12, 2022 at 1:30 p.m. in Dade City.
The source document
The county’s agenda for Board of County Commissioners, May 3, 2022
The published PDF, as served by the county. This item is one entry in it.
The county’s minutes for Board of County Commissioners, May 3, 2022
The published PDF, as served by the county. This item is one entry in it.
This case, across meetings
PDD-22-0288 in full →PDD-22-0288 was taken up 2 times between May 3, 2022 and Jul 12, 2022 — this is appearance 1.
- May 3, 2022BoardP54▶No actionthis item
- Jul 12, 2022BoardP93▶Adopted
What was said
Machine transcription of 4m of recording, with speaker names inferred from voice matching. 93% of 14 lines carry a name. It shows what was said, not what was decided, and both the words and the names can be wrong.
Item P fifty-four was published in the Tampa Bay Times on March twenty-third, twenty twenty-two.
Okay.
Madam Chair, Commissioner, my name is Ed Zodian. I'm a planner with long range. Then whoops, excuse me. The matter before you is a proposed amendment to the Land Development Code, Section 902. The proposed amendments were presented to the horizontal round table and interested parties meeting excuse me on March sixteenth. And on April 7th, the LPA voted unanimously to find the proposed ordinance consistent with the Pasco County Comprehensive
Plan. And recommended approval of the ordinance uh to this board.
Just by way of background for a moment. The current process is this. A uh with an initial application, a site plan is filed with all the horizontal features. uh before the slab is poured, a Form board survey is provided and reviewed. Now a form board survey does provide the elevations and setback issues. And then prior to the C O, a grading affidavit, an approved grading plan, and an as built survey is
provided. The proposed process will retain those first two steps. And then prior to the CO a grading affidavit and approved grading plan will also be approved as well as an elevation certificate and the as built will only be required if the site sits within a FEMA declared flood zone.
The first amendment is in section K1. It removes the engineer of record to inspect a lot upon completion and complete the as-built certification prior to the issuance of the certificate of occupancy.
The second amendment uh it's I'm sorry, it's section K4C. It adds a certificate of completion and affidavit of lot grading and finished floor elevation compliance be provided. It and for buildings and structures in flood hazard areas at elevation certificate as well as an as built survey demonstrating conformance to the approved stormwater management plan. It removes the Asbill survey and lot grading requirement
from all other aspects.
Today we'd ask that you accept public comment on this matter. No public excuse me no action is required by the board. Uh this is the first of two meetings. The second is scheduled for July twelfth here in uh Dade City. May I answer any questions? We have someone here from UCS to answer your questions as well if
Board members any questions? This was long overdue. Um did anyone want to speak on this one?
There is no one. Jennifer's gonna speak.
Good afternoon, Commissioners. My name is Jennifer Motzinger and I represent the Tampa Bay Builders Association. I just wanted to say thank you very much to all of you and to your staff for working with us to get this accomplished and we are one hundred and ten percent in support of this. Thank you very much.
Okay, so that requires no action, correct? So we'll move on to P fifty five.